In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project scheduling problem with mode identity. The proposed algorithm is extended with some bounding rules to reduce the size of branch and bound tree. Finally, some test problems are solved and their computational results are reported.
similar resources
an exact algorithm for the mode identity project scheduling problem
in this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (mrcpsp) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. we present a depth-first branch and bound algorithm for the resource constrained project schedulin...
full textAn Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm
In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...
full textthe algorithm for solving the inverse numerical range problem
برد عددی ماتریس مربعی a را با w(a) نشان داده و به این صورت تعریف می کنیم w(a)={x8ax:x ?s1} ، که در آن s1 گوی واحد است. در سال 2009، راسل کاردن مساله برد عددی معکوس را به این صورت مطرح کرده است : برای نقطه z?w(a)، بردار x?s1 را به گونه ای می یابیم که z=x*ax، در این پایان نامه ، الگوریتمی برای حل مساله برد عددی معکوس ارانه می دهیم.
15 صفحه اولThe Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...
full textan efficient genetic algorithm for solving the multi-mode resource-constrained project scheduling problem based on random key representation
in this paper, a new genetic algorithm (ga) is presented for solving the multi-mode resource-constrained project scheduling problem (mrcpsp) with minimization of project makespan as the objective subject to resource and precedence constraints. a random key and the related mode list (ml) representation scheme are used as encoding schemes and the multi-mode serial schedule generation scheme (mssg...
full textAn Efficient Genetic Agorithm for Solving the Multi-Mode Resource-Constrained Project Scheduling Problem Based on Random Key Representation
In this paper, a new genetic algorithm (GA) is presented for solving the multi-mode resource-constrained project scheduling problem (MRCPSP) with minimization of project makespan as the objective subject to resource and precedence constraints. A random key and the related mode list (ML) representation scheme are used as encoding schemes and the multi-mode serial schedule generation scheme (MSSG...
full textMy Resources
Journal title
volume 5 issue 10
pages 55- 63
publication date 2012-03-15
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023