This paper addresses the multi-mode multi-skilled resource-constrained project scheduling problem. Activities of real world projects often require more than one skill to be accomplished. Besides, in many real-world situations, the resources are multi-skilled workforces. In presence of multi-skilled resources, it is required to determine the combination of workforces assigned to each activity. Hence, in this paper, a mixed-integer formulation called the MMSRCPSP is proposed to minimize the completion time of project. Since the MMSRCPSP is strongly NP-hard, a new genetic algorithm is developed to find optimal or near-optimal solutions in a reasonable computation time. The proposed genetic algorithm (PGA) employs two new strategies to explore the solution space in order to find diverse and high-quality individuals. Furthermore, the PGA uses a hybrid multi-attribute decision making (MADM) approach consisting of the Shannon’s entropy method and the VIKOR method to select the candidate individuals for reproduction. The effectiveness of the PGA is evaluated by conducting numerical experiments on several test instances. The outputs of the proposed algorithm is compared to the results obtained by the classical genetic algorithm, harmony search algorithm, and Neurogenetic algorithm. The results show the superiority of the PGA over the other three methods. To test the efficiency of the PGA in finding optimal solutions, the make-span of small size benchmark problems are compared to the optimal solutions obtained by the GAMS software. The outputs show that the proposed genetic algorithm has obtained optimal solutions for 70% of test problems.
similar resources
The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...
full textthe combinatorial multi-mode resource constrained multi-project scheduling problem
this paper presents the formulation and solution of the combinatorial multi-mode resource constrained multi-project scheduling problem. the focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. the motivation for developing such an approach is due in part to practica...
full textAn Efficient Genetic Agorithm for Solving the Multi-Mode Resource-Constrained Project Scheduling Problem Based on Random Key Representation
In this paper, a new genetic algorithm (GA) is presented for solving the multi-mode resource-constrained project scheduling problem (MRCPSP) with minimization of project makespan as the objective subject to resource and precedence constraints. A random key and the related mode list (ML) representation scheme are used as encoding schemes and the multi-mode serial schedule generation scheme (MSSG...
full textan efficient genetic algorithm for solving the multi-mode resource-constrained project scheduling problem based on random key representation
in this paper, a new genetic algorithm (ga) is presented for solving the multi-mode resource-constrained project scheduling problem (mrcpsp) with minimization of project makespan as the objective subject to resource and precedence constraints. a random key and the related mode list (ml) representation scheme are used as encoding schemes and the multi-mode serial schedule generation scheme (mssg...
full textOptimization of an energy based bi-objective multi skilled resource investment project scheduling problem
Growing concern in the management of energy due to the increasing energy costs, has forced managers to optimize the amount of energy required to provide products and services. This research integrates an energy-based resource investment project-scheduling problem (RIP) under a multi-skilled structure of the resources. The proposed energy based multi skilled resource investment problem (EB-MSRIP...
full textModeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition
In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...
full textMy Resources
Journal title
volume 12 issue 2
pages 155- 178
publication date 2019-07-01
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023