An Analytic Model for Organization Readiness of Engineering Project Management Based on Virtual Teams

Authors

  • Farid Khoshalhan Faculty of Information Technology, Islamic Azad University, Electronic Branch
Abstract:

 The Organization Readiness of Engineering Project Management Based on Virtual Teams has been analyzed in an Iranian Engineering firm. Adapting and analyzing the latest readiness model, experts’ opinions were received by questionnaires and main criteria of the readiness have been identified. The considered readiness criteria are: Infrastructure, Deliverables (Drawings, Reports, Minutes of Meetings, Letters and Invoices), Human Resources, Information Technology and Communications, Organization Chart, Financial Resources and Business Environment Factors. They have been classified by Interpretive Structural Model (ISM) and MicMac Analysis. The Priorities have been determined by Friedman Test. The sub-criteria of two main criteria with the highest priority are Human Resources and Deliverables that have been selected by experts and their priorities have been determined by calculation of the Eigenvalue in the linear system of the model. In order to enlist virtual teams in this engineering firm, it is necessary to improve human resources team knowledge, which increases the quality of the deliverables. 

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

A Systems Dynamics Model for Project Management systems of Project-Based Organization

It is obvious that the success of a project-based organization is dependent on its projects. A variety of tools such as the project excellence model, project management maturity models, the earned value method, have been developed in this regard, but there are still delays in projects because the projects have dynamic nature with non-linear relationships and feedback processes during the projec...

full text

Project Managers Competencies based on ICB and Project Management Processes based on PMBOK in Project Based Organization (Case study: Hydropower Plants Management)

Effective implementation of managerial systems needs software and hardware requirements. Project management competencies of the managers is one of the most important and inevitable requirements to ensure the success of the projects in any industry. Inorder to clarify the requirements, many international and professional instituts have presented well-known frameworks to help the managers to shap...

full text

application of upfc based on svpwm for power quality improvement

در سالهای اخیر،اختلالات کیفیت توان مهمترین موضوع می باشد که محققان زیادی را برای پیدا کردن راه حلی برای حل آن علاقه مند ساخته است.امروزه کیفیت توان در سیستم قدرت برای مراکز صنعتی،تجاری وکاربردهای بیمارستانی مسئله مهمی می باشد.مشکل ولتاژمثل شرایط افت ولتاژواضافه جریان ناشی از اتصال کوتاه مدار یا وقوع خطا در سیستم بیشتر مورد توجه می باشد. برای مطالعه افت ولتاژ واضافه جریان،محققان زیادی کار کرده ...

15 صفحه اول

Management of Virtual Project Teams: Guidelines for Team Leaders

This article offers a set of guidelines to assist project leaders when managing virtual project teams. The guidelines were developed as a result of a panel at the celebration of the 30 anniversary of the founding of the MIS department at the University of Arizona. These guidelines include recommendations for addressing challenges that occur over the virtual team project life cycle, including id...

full text

an application of equilibrium model for crude oil tanker ships insurance futures in iran

با توجه به تحریم های بین المملی علیه صنعت بیمه ایران امکان استفاده از بازارهای بین المملی بیمه ای برای نفتکش های ایرانی وجود ندارد. از طرفی از آنجایی که یکی از نوآوری های اخیر استفاده از بازارهای مالی به منظور ریسک های فاجعه آمیز می باشد. از اینرو در این پایان نامه سعی شده است با استفاده از این نوآوری ها با طراحی اوراق اختیارات راهی نو جهت بیمه گردن نفت کش های ایرانی ارائه نمود. از آنجایی که بر...

mortality forecasting based on lee-carter model

over the past decades a number of approaches have been applied for forecasting mortality. in 1992, a new method for long-run forecast of the level and age pattern of mortality was published by lee and carter. this method was welcomed by many authors so it was extended through a wider class of generalized, parametric and nonlinear model. this model represents one of the most influential recent d...

15 صفحه اول

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 7  issue 2

pages  869- 877

publication date 2018-12-01

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023