A THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
author
Abstract:
The cumulative resource constraints of the resource-constrained project scheduling problem (RCPSP) do not treat the resource demands as geometric rectangles, that is, activities are not necessarily assigned to the same resource units over their processing times. In spite of this fact, most papers on resource-constrained project scheduling mainly in the motivation phase use a strip packing of rectangles (SPR) like visualization to illustrate the resource allocation. A novice researcher inspired by the "artistic" SPR visualization may think that the "rectangles" are essential elements of the RCPSP, and that the RCPSP is a special counter-intuitive strip packing problem (SPP) which can be solved without explicitly defined strip packing constraints. In this context "artistic" means, that we have to use a "drawing tool" to produce a SPR like visualization, because the standard model of the RCPSP knows nothing about the rectangles. In the RCPSP, the rectangles can be torn vertically and horizontally, which is absurd in the SPP, and the existence of a cumulative solution is only a necessary but not sufficient condition of the existence of the SPR like visualization, as proven by several researchers. Therefore the popular SPR visualization is theoretically wrong and misleading, and hides a real problem, which is connected to the dedicated resource assignment. In this paper, we prove that replacing the rectangles with a set of strips with unit height we can always generate a theoretically correct strip packing of strips (SPS) like dedicated assignment, where dedicated means that each demand unit is served by exactly one resource unit over its duration without "hidden" transfer time and cost.
similar resources
The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...
full textUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
full textA UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS
In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...
full textAn Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm
In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...
full textthe combinatorial multi-mode resource constrained multi-project scheduling problem
this paper presents the formulation and solution of the combinatorial multi-mode resource constrained multi-project scheduling problem. the focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. the motivation for developing such an approach is due in part to practica...
full textA dynamic resource constrained project scheduling problem
In this paper, we present a variant of classical scheduling problems which deal with restricted resources. Unlike other models studied in the literature, the proposed model has no upper bound for the amount of available resources. The objective of this variant is to find a solution that maximises this amount at the end of the planning horizon. A hybrid evolutionary algorithm is proposed for thi...
full textMy Resources
Journal title
volume 2 issue 2
pages 173- 181
publication date 2012-06