A stochastic model for project selection and scheduling problem

Authors

  • F. Molavi Sadjad University of Technology, Mashhad, Iran.
Abstract:

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing variance of them. Benefiting an efficient multi-objective approach to satisfy every conflicting objective, an integer non-linear goal programming model is developed. Another contribution of this paper is to consider cost dependency between the projects, in project portfolio selection and scheduling problem. Due to the complexity of this problem, especially in large sizes, imperialist competitive algorithm and genetic algorithm are presented. The effectiveness of the model and proposed algorithms are demonstrated via a case study in a knowledge based company at Ferdowsi University of Mashhad. The result shows high performance of the both proposed algorithms.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

a stochastic model for project selection and scheduling problem

resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. in this study, budget, investment costs and earnings are considered to be stochastic. the objectives are maximizing net present values of selected projects and minimizing v...

full text

The project portfolio selection and scheduling problem: mathematical model and algorithms

This paper investigates the problem of selecting and scheduling a set of projects among available projects. Each project consists of several tasks and to perform each one some resource is required. The objective is to maximize total benefit. The paper constructs a mathematical formulation in form of mixed integer linear programming model. Three effective metaheuristics in form of the imperialis...

full text

A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS

In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...

full text

the project portfolio selection and scheduling problem: mathematical model and algorithms

this paper investigates the problem of selecting and scheduling a set of projects among available projects. each project consists of several tasks and to perform each one some resource is required. the objective is to maximize total benefit. the paper constructs a mathematical formulation in form of mixed integer linear programming model. three effective metaheuristics in form of the imperialis...

full text

A Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes

Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, ...

full text

A Grey-Based Fuzzy ELECTRE Model for Project Selection

Project selection is considered as an important problem in project management. It is multi-criteria in nature and is based on various quantitative and qualitative factors. The main purpose of this paper is to present a new rank-based method for project selection in outranking relation. According to this approach, decision alternatives were clustered in the concordance matrix and the discordance...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 3  issue 1

pages  77- 88

publication date 2016-06-01

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023