A Single Machine Capacitated Production Planning Problem Under Uncertainty: A Grey Linear Programming Approach

author

Abstract:

The production planning is an important problem in most of manufacturing systems in practice. Unlike many researches existing in literature, this problem encounters with great uncertainties in parameters and input data. In this paper, a single machine capacitated production planning problem is considered and a linear programming formulation is presented. The production costs are assumed to be uncertain parameters. To handle the uncertainties in the model, the grey systems theory is employed and the concept of grey numbers is incorporated into an optimization framework. In such systems, the uncertain parameters with unknown distributions can be handled by grey numbers. The grey linear programming (GLP) is a development of the classical linear programming which allows uncertainty to be effectively communicated into the optimization process. Finally, the uncertain problem is transformed into a GLP, and is solved by two linear deterministic sub-models.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

A Possibility Linear Programming Approach to Solve a Fuzzy Single Machine Scheduling Problem

This paper employs an interactive possibility linear programming approach to solve a single machine scheduling problem with imprecise processing times, due dates, as well as earliness and tardiness penalties of jobs. The proposed approach is based on a strategy of minimizing the most possible value of the imprecise total costs, maximizing the possibility of obtaining a lower total costs, and mi...

full text

Periodic flexible maintenance planning in a single-machine production environment

Preventive maintenance is the essential part of many maintenance plans. From the production point of view, the flexibility of the maintenance intervals enhances the manufacturing efficiency. On the contrary, the maintenance departments tend to know the timing of the long term maintenance plans as certain as possible. In a single-machine production environment, this paper proposes a simulation–o...

full text

A Nadir Compromise Programming for Supplier Selection Problem under Uncertainty

Supplier selection is one of the influential decisions for effectiveness of purchasing and manufacturing policies under competitive conditions of the market. Regarding the fact that decision makers (DMs) consider conflicting criteria for selecting suppliers, multiple-criteria programming is a promising approach to solve the problem. This paper develops a nadir compromise programming (NCP) model...

full text

Optimizing decentralized production–distribution planning problem in a multi-period supply chain network under uncertainty

Decentralized supply chain management is found to be significantly relevant in today’s competitive markets. Production and distribution planning is posed as an important optimization problem in supply chain networks. Here, we propose a multi-period decentralized supply chain network model with uncertainty. The imprecision related to uncertain parameters like demand and price of the final produc...

full text

A Stochastic Programming Approach for a Multi-Site Supply Chain Planning in Textile and Apparel Industry under Demand Uncertainty

In this study, a new stochastic model is proposed to deal with a multi-product, multi-period, multi-stage, multi-site production and transportation supply chain planning problem under demand uncertainty. A two-stage stochastic linear programming approach is used to maximize the expected profit. Decisions such as the production amount, the inventory level of finished and semi-finished product, t...

full text

A mixed integer linear programming formulation for a multi-stage, multi-Product, multi-vehicle aggregate production-distribution planning problem

In today’s competitive market place, companies seek an efficient structure of supply chain so as to provide customers with highest value and achieve competitive advantage. This requires a broader perspective than just the borders of an individual company during a supply chain. This paper investigates an aggregate production planning problem integrated with distribution issues in a supply chain ...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 29  issue 4

pages  524- 529

publication date 2016-04-01

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023