Scheduling problems play a big role in manufacturing and planning the production for increasing the production efficiency and assigning the resources to operations. Furthermore, in many manufacturing systems there is a physical space between stages that called intermediate buffers. In this study, a model is proposed for minimizing the makespan of a hybrid flow shop scheduling problem with intermediate buffers and resource constraints. These constraints exist in almost every realistic manufacturing system and have an imperative impact on improving the production cost, productivity, and sustainability. In this study, a hybrid algorithm based on genetic algorithm and variable neighborhood search was used, which in tuned with Taguchi’s method helped in solving the proposed model for a tire manufacturing company. The results show that the proposed mathematical model has a high ability for scheduling problems with resource and intermediate buffer constraints and is solvable by the hybrid genetic algorithm.
similar resources
A Mathematical Model and a Solution Method for Hybrid Flow Shop Scheduling
This paper studies the hybrid flow shop scheduling where the optimization criterion is the minimization of total tardiness. First, the problem is formulated as a mixed integer linear programming model. Then, to solve large problem sizes, an artificial immune algorithm hybridized with a simple local search in form of simulated annealing is proposed. Two experiments are carried out to evaluate th...
full textA Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times
This paper presents a mathematical model for a flow shop scheduling problem consisting of m machine and n jobs with fuzzy processing times that can be estimated as independent stochastic or fuzzy numbers. In the traditional flow shop scheduling problem, the typical objective is to minimize the makespan). However,, two significant criteria for each schedule in stochastic models are: expectable m...
full textA multi-objective mathematical model for nurse scheduling problem with hybrid DEA and augmented ε-constraint method: A case study
The efficient management of nursing personnel is of vital importance in a hospital’s environment comprising a vast share of the hospital’s operational costs. In the nurse scheduling problem (NSP), the target is to allocate shifts to the nurses in order to satisfy the hospital’s demand during the planning horizon by considering different objective functions. This paper presents a multi-objective...
full texta mathematical model and a solution method for hybrid flow shop scheduling
this paper studies the hybrid flow shop scheduling where the optimization criterion is the minimization of total tardiness. first, the problem is formulated as a mixed integer linear programming model. then, to solve large problem sizes, an artificial immune algorithm hybridized with a simple local search in form of simulated annealing is proposed. two experiments are carried out to evaluate th...
full texta mathematical model for a flow shop scheduling problem with fuzzy processing times
this paper presents a mathematical model for a flow shop scheduling problem consisting of m machine and n jobs with fuzzy processing times that can be estimated as independent stochastic or fuzzy numbers. in the traditional flow shop scheduling problem, the typical objective is to minimize the makespan). however,, two significant criteria for each schedule in stochastic models are: expectable m...
full textA Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production
In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...
full textMy Resources
Journal title
volume 10 issue special issue on scheduling