A New Uncertain Modeling of Production Project Time and Cost Based on Atanassov Fuzzy Sets

Authors

  • B. Vahdani Faculty of Industrial & Mechanical Engineering, Qazvin Branch, Islamic Azad University
Abstract:

  Uncertainty plays a major role in any project evaluation and management process. One of the trickiest parts of any production project work is its cost and time forecasting. Since in the initial phases of production projects uncertainty is at its highest level, a reliable method of project scheduling and cash flow generation is vital to help the managers reach successful implementation of the project. In the recent years, some scholars have tried to address uncertainty of projects in time and cost by using basic uncertainty modeling tools such as fuzzy sets theory. In this paper, a new approach is introduced to model project cash flow under uncertain environments using Atanassov fuzzy sets or intuitionistic fuzzy sets (IFSs). The IFSs are presented to calculate project scheduling and cash flow generation. This modern approach enhances the ability of managers to use their intuition and lack of knowledge in their decision-makings. Moreover, unlike the recent studies in this area, this model uses a more sophisticated tool of uncertain modeling which is highly practical in real production project environments. Furthermore, a new effective IFS-ranking method is introduced. The methodology is exemplified by estimating the working capital requirements in an activity network. The proposed model could be useful for both project proposal evaluation during feasibility studies and for performing earned value analysis for project monitoring and control.  

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

a new uncertain modeling of production project time and cost based on atanassov fuzzy sets

uncertainty plays a major role in any project evaluation and management process. one of the trickiest parts of any production project work is its cost and time forecasting. since in the initial phases of production projects uncertainty is at its highest level, a reliable method of project scheduling and cash flow generation is vital to help the managers reach successful implementation of the pr...

full text

Fuzzy automata based on Atanassov fuzzy sets and applications on consumers’ advertising involvement

Department of Industrial and Business Management, College of Management, Chang Gung University, 259, Wen-Hwa 1st Road, Kwei-Shan, Taoyuan 333, Taiwan. Graduate Institute of Business Administration, College of Management, Chang Gung University, 259, Wen-Hwa 1st Road, Kwei-Shan, Taoyuan 333, Taiwan. Department of Information Management, College of Management, Chang Gung University, 259, Wen-Hwa 1...

full text

TIME-VARYING FUZZY SETS BASED ON A GAUSSIAN MEMBERSHIP FUNCTIONS FOR DEVELOPING FUZZY CONTROLLER

The paper presents a novel type of fuzzy sets, called time-Varying Fuzzy Sets (VFS). These fuzzy sets are based on the Gaussian membership functions, they are depended on the error and they are characterized by the displacement of the kernels to both right and left side of the universe of discourse, the two extremes kernels of the universe are fixed for all time. In this work we focus only on t...

full text

task-based language teaching in iran: a mixed study through constructing and validating a new questionnaire based on theoretical, sociocultural, and educational frameworks

جنبه های گوناگونی از زندگی در ایران را از جمله سبک زندگی، علم و امکانات فنی و تکنولوژیکی می توان کم یا بیش وارداتی در نظر گرفت. زبان انگلیسی و روش تدریس آن نیز از این قاعده مثتسنی نیست. با این حال گاهی سوال پیش می آید که آیا یک روش خاص با زیر ساخت های نظری، فرهنگی اجتماعی و آموزشی جامعه ایرانی سازگاری دارد یا خیر. این تحقیق بر اساس روش های ترکیبی انجام شده است.پرسش نامه ای نیز برای زبان آموزان ...

A New Mathematical Approach based on Conic Quadratic Programming for the Stochastic Time-Cost Tradeoff Problem in Project Management

In this paper, we consider a stochastic Time-Cost Tradeoff Problem (TCTP) in PERT networks for project management, in which all activities are subjected to a linear cost function and assumed to be exponentially distributed. The aim of this problem is to maximize the project completion probability with a pre-known deadline to a predefined probability such that the required additional cost is min...

full text

A new framework for high-technology project evaluation and project portfolio selection based on Pythagorean fuzzy WASPAS, MOORA and mathematical modeling

High-technology projects are known as tools that help achieving productive forces through scientific and technological knowledge. These knowledge-based projects are associated with high levels of risks and returns. The process of high-technology project and project portfolio selection has technical complexities and uncertainties. This paper presents a novel two-parted method of high-technology ...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 1  issue 2

pages  57- 70

publication date 2015-10-25

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023