A new solving approach for fuzzy multi-objective programming problem in uncertainty conditions by using semi-infinite linear programing
Authors
Abstract:
In practice, there are many problems which decision parameters are fuzzy numbers, and some kind of this problems are formulated as either possibilitic programming or multi-objective programming methods. In this paper, we consider a multi-objective programming problem with fuzzy data in constraints and introduce a new approach for solving these problems base on a combination of the multi-objective programming model and a linear semi-infinite programming problem. In particular, in the suggested solving process, we will use the weighted method to solve the mentioned multi-objective programming problem. Finally, a numerical example is included to illustrate the suggested solving process.
similar resources
A new solving approach for fuzzy flexible programming problem in uncertainty conditions
Modeling and solving real world problems is one of the most important issues in optimization problems. In this paper, we present an approach to solve Fuzzy Interval Flexible Linear Programming (FIFLP) problems that simultaneously have the interval ambiguity in the matrix of coefficients .In the first step, using the interval problem solving techniques; we transform the fuzzy interval flexible p...
full textA new approach for solving fuzzy multi-objective quadratic programming of water resource allocation problem
full text
A New Method For Solving Linear Bilevel Multi-Objective Multi-Follower Programming Problem
Linear bilevel programming is a decision making problem with a two-level decentralized organization. The leader is in the upper level and the follower, in the lower level. This study addresses linear bilevel multi-objective multi-follower programming (LB-MOMFP) problem, a special case of linear bilevel programming problems with one leader and multiple followers where each decision maker has sev...
full textA new method for solving fuzzy multi-objective linear programming problems
The purpose of this paper is to develop a new two-stage method for fuzzy multi-objective linear program and apply to engineering project portfolio selection. In the fuzzy multi-objective linear program, all the objective coefficients, technological coefficients and resources are trapezoidal fuzzy numbers (TrFNs). An order relationship for TrFNs is introduced by using the interval expectation of...
full textsolution of security constrained unit commitment problem by a new multi-objective optimization method
چکیده-پخش بار بهینه به عنوان یکی از ابزار زیر بنایی برای تحلیل سیستم های قدرت پیچیده ،برای مدت طولانی مورد بررسی قرار گرفته است.پخش بار بهینه توابع هدف یک سیستم قدرت از جمله تابع هزینه سوخت ،آلودگی ،تلفات را بهینه می کند،و هم زمان قیود سیستم قدرت را نیز برآورده می کند.در کلی ترین حالتopf یک مساله بهینه سازی غیر خطی ،غیر محدب،مقیاس بزرگ،و ایستا می باشد که می تواند شامل متغیرهای کنترلی پیوسته و گ...
My Resources
Journal title
volume 9 issue 1
pages 41- 46
publication date 2019-01
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023