A New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value
Authors
Abstract:
Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is on the base of the minimum cost slope of activities. But since projects are usually performed over long periods, they can be affected by interest rate. In this paper, a new heuristic algorithm is presented in order to obtain the best combination of activity duration decrease while the monetary value is taken into account, with the goal of minimizing the sum of present value of project costs
similar resources
Presenting a Multi-Objective Mathematical Model for Time-Cost trade off Problem Considering Time Value of Money and Solve it by MOPSO Algorithm
The time - cost tradeoff problem is one of the most critical issues in the project scheduling field and so far, a lot of research has been done with a variety of quantitative and qualitative approaches on this subject. In this research, we intend to provide a two - objective mathematical model which balances crash and delay for activities. So that it provides the right tools for decision makers...
full textA Hybrid Method Based on Fuzzy AHP and VIKOR for the Discrete Time-Cost-Quality Trade-off Problem
Time, cost and quality are considered as the main components in managing each project. Previous researches have mainly focused on the time-cost trade-off problems. Recently quality is considered as the most important factor in project�s success, which is influenced by time acceleration that is the less time is spent the more success is gained. In time-cost-quality trade-off problems, each act...
full textA New Mathematical Model for Time Cost Trade-off Problem with Budget Limitation Based on Time Value of Money
The main objective in the time cost trade-off problems has always been the reduction in the total cost. In the previous researches the total cost function has been defined 3 * corresponding author e-Mail: [email protected]
full textAN EXTENSION TO STOCHASTIC TIME-COST TRADE-OFF PROBLEM OPTIMIZATION WITH DISCOUNTED CASH FLOW
In this paper, an efficient multi-objective model is proposed to solve time-cost trade off problem considering cash flows. The proposed multi-objective meta-heuristic is based on Ant colony optimization and is called Non Dominated Archiving Ant Colony Optimization (NAACO). The significant feature of this work is consideration of uncertainties in time, cost and more importantly interest rate. A ...
full textA Portfolio Approach to Algorithm Selection for Discrete Time-Cost Trade-off Problem
It is a known fact that the performance of optimization algorithms for NP-Hard problems vary from instance to instance. We observed the same trend when we comprehensively studied multiobjective evolutionary algorithms (MOEAs) on a six benchmark instances of discrete time-cost trade-off problem (DTCTP) in a construction project. In this paper, instead of using a single algorithm to solve DTCTP, ...
full textMy Resources
Journal title
volume 24 issue 1
pages 31- 46
publication date 2005-07
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023