A New Approach Generating Robust and Stable Schedules in m-Machine Flow Shop Scheduling Problems: A Case Study

Authors

  • D. Rahmani Department of Industrial Engineering, K.N. Toosi University of Technology, Tehran, Iran
  • R. Sahraeian Department of Industrial Engineering, College of Engineering, Shahed University, Tehran, Iran
  • Z. Abtahi Department of Industrial Engineering, College of Engineering, Shahed University, Tehran, Iran
Abstract:

This paper considers a scheduling problem with uncertain processing times and machine breakdowns in industriall/office workplaces and solves it via a novel robust optimization method. In the traditional robust optimization, the solution robustness is maintained only for a specific set of scenarios, which may worsen the situation  for new scenarios. Thus, a two-stage predictive algorithm is proposed to efficiently handle the uncertainties and find robust and stable solutions. The first stage creates robust solutions and ensures their stability in the new scenarios. The second stage proposes a novel stability measure to proactively offset the effects of the machine breakdowns of the former stage. Moreover, a tri-component measure based on efficiency, robustness, and stability is proposed which aims to create a realistic schedule to satisfy the customers, manufacturers, and the staff. To meet the customer’s requirements, the robustness measure is defined based on the tardiness and the delivery dates of jobs. Finally, the proposed algorithm is applied to a case study, and the findings are compared with the empirical data. The results emphasize the superiority of the proposed technique in satisfying the customers, staff, and increasing the profitability and accountability of the company.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Flow shop Scheduling Problem with Maintenance Coordination: a New Approach

This study investigates the coordination of production scheduling and maintenance planning in theflow shop scheduling environment. The problem is considered in a bi-objective form, minimizing themakespan as the production scheduling criterion and minimizing the system unavailability as themaintenance planning criterion. The time interval between consecutive maintenance activities as well as the...

full text

A New Approach in Job Shop Scheduling: Overlapping Operation

In this paper, a new approach to overlapping operations in job shop scheduling is presented. In many job shops, a customer demand can be met in more than one way for each job, where demand determines the quantity of each finished job ordered by a customer. In each job, embedded operations can be performed due to overlapping considerations in which each operation may be overlapped with the other...

full text

Net Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems

While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...

full text

Net Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems

While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...

full text

flow shop scheduling problem with maintenance coordination: a new approach

this study investigates the coordination of production scheduling and maintenance planning in theflow shop scheduling environment. the problem is considered in a bi-objective form, minimizing themakespan as the production scheduling criterion and minimizing the system unavailability as themaintenance planning criterion. the time interval between consecutive maintenance activities as well as the...

full text

Customer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop

This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 33  issue 2

pages  293- 303

publication date 2020-02-01