َA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times

Authors

  • Bahman Naderi Young Researches Club, Qazvin Branch, Islamic Azad University, Qazvin, Iran
  • Hassan Sadeghi Young Researchers Club, Qazvin Branch, Islamic Azad University, Qazvin, Iran
Abstract:

This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presents a new multi-objective simulated annealing algorithm (MOSA). A set of experimental instances are carried out to evaluate the algorithm by advanced multi-objective performance measures. The algorithm is carefully evaluated for its performance against available algorithm by means of multi-objective performance measures and statistical tools. The related results show that a variant of our proposed MOSA provides sound performance comparing with other algorithms.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

َa multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times

this paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. this paper presen...

full text

A Simulated Annealing Algorithm for Multi Objective Flexible Job Shop Scheduling with Overlapping in Operations

In this paper, we considered solving approaches to flexible job shop problems. Makespan is not a good evaluation criterion with overlapping in operations assumption. Accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. As overlapping in operations is a practical assumption in chemical, petrochemical, and gla...

full text

a simulated annealing algorithm for multi objective flexible job shop scheduling with overlapping in operations

in this paper, we considered solving approaches to flexible job shop problems. makespan is not a good evaluation criterion with overlapping in operations assumption. accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. as overlapping in operations is a practical assumption in chemical, petrochemical, and gla...

full text

No-wait flexible flowshop scheduling with no-idle machines

This paper considers a two-stage flexible flowshop scheduling problem with no waiting time between two sequential operations of a job and no idle time between two consecutive processed jobs on machines of the second stage. We show its complexity and present a heuristic algorithm with asymptotically tight error bounds. © 2004 Elsevier B.V. All rights reserved.

full text

Solving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm

In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...

full text

A hybrid genetic algorithm for solving no-wait flowshop scheduling problems

A hybrid genetic algorithm is proposed in this paper to minimize the makespan and the total flowtime in the no-wait flowshop scheduling problem, which is known to be NP-hard for more than two machines. The Variable Neighborhood Search is used as an improvement procedure in the last step of the genetic algorithm. First, comparisons are provided with respect to several techniques that are represe...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 5  issue 11

pages  33- 41

publication date 2012-09-30

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023