A MULTI-OBJECTIVE DECENTRALIZED MULTIPLE CONSTRUCTION PROJECTS SCHEDULING PROBLEM CONSIDERING PERIODIC SERVICES AND ORDERING POLICIES

Authors

  • M. Bagherpour
  • M. H. Hosseini
  • M. Rostami
Abstract:

In decentralized construction projects, costs are mostly related to investment, material, holding, logistics, and other minor costs for implementation. For this reason, simultaneous planning of these items and appropriate scheduling of activities can significantly reduce the total costs of the project undertaken. This paper investigates the decentralized multiple construction projects scheduling problem with the aim of minimizing 1) the completion time of the construction projects and 2) the costs of project implementation. Initially, a bi-objective integer programming model is proposed which can solve small-size problems using the method. Then, a Priority Heuristic Algorithm (PHA), Non-dominate Sorting Artificial Bee Colony (NSABC) and Non-dominate Sorting Genetic Algorithm II (NSGA-II) are developed to handle large-size problems using a modified version of Parallel Schedule Generation Scheme (PSGS). The computational investigations significantly reveal the performance of the proposed heuristic methods over exact ones. Finally, the proposed methods are ranked using TOPSIS approach and metric definition. The results show that NSGA-II-100 (NSGA-II with 100 iterations), NSABC-100 (NSABC with 100 iterations) and PHA are ranked as the best known solution methods, respectively.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING

During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...

full text

A multi-objective mathematical model for production-distribution scheduling problem

With increasing competition in the business world and the emergence and development of new technologies, many companies have turned to integrated production and distribution for timely production and delivery at the lowest cost of production and distribution and with the least delay in delivery. By increasing human population and the increase in greenhouse gas emissions and industrial waste, in...

full text

Multi-Objective Scheduling Problem in a Three-Stage Production System

A three stage production system is considered in this paper. There are two stages to fabricate and ready the parts and an assembly stage to assembly the parts and complete the products in this system. Suppose that a number of products of different kinds are ordered. Each product is assembled with a set of several parts. At first the parts are produced in the first stage with parallel machines a...

full text

A multi-objective memetic algorithm for risk minimizing vehicle routing problem and scheduling problem

In this paper, a new approach to risk minimizing vehicle routing and scheduling problem is presented. Forwarding agents or companies have two main concerns for the collection of high-risk commodities like cash or valuable commodities between the central depot and the customers: one; because of the high value of the commodities transported, the risk of ambush and robbery are very high. Two; the ...

full text

A multiple objective approach for joint ordering and pricing planning problem with stochastic lead times

The integration of marketing and demand with logistics and inventories (supply side of companies) may cause multiple improvements; it can revolutionize the management of the revenue of rental companies, hotels, and airlines. In this paper, we develop a multi-objective pricing-inventory model for a retailer. Maximizing the retailer's profit and the service level are the objectives, and shorta...

full text

multi-objective scheduling problem in a three-stage production system

a three stage production system is considered in this paper. there are two stages to fabricate and ready the parts and an assembly stage to assembly the parts and complete the products in this system. suppose that a number of products of different kinds are ordered. each product is assembled with a set of several parts. at first the parts are produced in the first stage with parallel machines a...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 11  issue 2

pages  195- 230

publication date 2021-05

By following a journal you will be notified via email when a new issue of this journal is published.

Keywords

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023