Abstract:

This paper presents an exact model for the resource investment problem with generalized precedence relations in which the minimum or maximum time lags between a pair of activities may vary depending on the chosen modes. All resources considered are renewable. The objective is to determine a mode and a start time for each activity so that all constraints are obeyed and the resource investment cost is minimized. Project scheduling of this type occurs in many fields for instance, construction industries. The proposed model has been inspired by the packing problems. In spite of the fact that it needs a feasible solution to start for conventional models, the new model has no need for a feasible solution to startup with. Computational results with a set of 60 test problems have been reported and the efficiency of the proposed model has been analyzed.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...

full text

Modeling and Solution Procedure for a Preemptive Multi-Objective Multi-Mode Project Scheduling Model in Resource Investment Problems

In this paper, a preemptive multi-objective multi-mode project scheduling model for resource investment problem is proposed. The first objective function is to minimize the completion time of project (makespan);the second objective function is to minimize the cost of using renewable resources. Non-renewable resources are also considered as parameters in this model. The preemption of activities ...

full text

A multi-objective mathematical model for production-distribution scheduling problem

With increasing competition in the business world and the emergence and development of new technologies, many companies have turned to integrated production and distribution for timely production and delivery at the lowest cost of production and distribution and with the least delay in delivery. By increasing human population and the increase in greenhouse gas emissions and industrial waste, in...

full text

the combinatorial multi-mode resource constrained multi-project scheduling problem

this paper presents the formulation and solution of the combinatorial multi-mode resource constrained multi-project scheduling problem. the focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. the motivation for developing such an approach is due in part to practica...

full text

Project resource investment problem under progress payment model

As a general branch of project scheduling problems, resource investment problem (RIP) considers resource availabilities as decision variables to determine a level of employed resources minimizing the costs of the project. In addition to costs (cash outflows), researchers in the later extensions of the RIP took payments (cash inflows) received from clients into account and used the net present v...

full text

An Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm

In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 4  issue 7

pages  -

publication date 2007-05-01

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023