A MATHEMATICAL MODEL FOR SELECTING THE PROJECT RISK RESPONSES IN CONSTRUCTION PROJECTS
Authors
Abstract:
Risks are natural and inherent characteristics of major projects. Risks are usually considered independently in analysis of risk responses. However, most risks are dependent on each other and independent risks are rare in the real world. This paper proposes a model for proper risk response selection from the responses portfolio with the purpose of optimization of defined criteria for projects. This research has taken into account the relationships between risk responses; especially the relationships between risks, which have been rarely considered in previous works. It must be pointed out that not considering or superficial evaluation of the interactions between risks and risk responses reduces the expected desirability and increases project execution costs. This model is capable of optimization of different criteria in the objective function based on the proposed projects. Multi-objective Harmony Search (MOHS) and Non-dominated Sorting Genetic Algorithm II (NSGA-II) are used to solve this model and the numerical results obtained are analyzed. Finally, it was observed that ranges of objective functions in MOHS are better than those in NSGA-II.
similar resources
Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
full textdesigning a model for selecting construction projects in public sector
much research hasn’t been done in the area of project selection in the public sector. in this paper, we tried to choose projects in the public sector, and a linear programming model is presented. in an effort to build the model, the decision criteria were identified using the delphi method and then the criteria were reviewed at conceptual combining. the model was constructed in a linear, goal a...
full textTime Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry
This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...
full textProject Manager Competency Model based on ANP Method in Construction Projects
Most developed countries have already accepted‘’ Competency’’ as the major factor in making management more competitive, therefore they have discovered the importance of Qualification Models and their application to cause human resources growth. Consequently, their aim is to improve the qualification of their human resources, and to reach this end, considering different ways of assessing compet...
full textA Model for Prioritizing the Risks Associated with Road Construction Projects Based on Generalized Secondary Goal
This paper aims at providing a new model based on Data Envelopment Analysis (DEA) to prioritize project risks. It is clear that the large amounts of involved capitals, the long term of infrastructure projects’ implementation, and the project management problems in on-time completion of projects indicate the necessity of paying particular attention to this issue and conducting applied researc...
full textA Neural Network Model Based on Support Vector Machine for Conceptual Cost Estimation in Construction Projects
Estimation of the conceptual costs in construction projects can be regarded as an important issue in feasibility studies. This estimation has a major impact on the success of construction projects. Indeed, this estimation supports the required information that can be employed in cost management and budgeting of these projects. The purpose of this paper is to introduce an intelligent model to im...
full textMy Resources
Journal title
volume 8 issue 4
pages 601- 624
publication date 2018-10
By following a journal you will be notified via email when a new issue of this journal is published.
No Keywords
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023