A cloud-based simulated annealing algorithm for order acceptance problem with weighted tardiness penalties in permutation flow shop scheduling

Authors

  • M. Zandieh Department of Industrial Management, Faculty of Management and Accounting, Shahid Beheshti University, G.C., Tehran, Iran.
  • M.M. Asgari Tehrani Department of Industrial Management, Faculty of Management and Accounting, Shahid Beheshti University, G. C., Tehran, Iran.
Abstract:

Make-to-order is a production strategy in which manufacturing starts only after a customer's order is received; in other words, it is a pull-type supply chain operation since manufacturing is carried out as soon as the demand is confirmed. This paper studies the order acceptance problem with weighted tardiness penalties in permutation flow shop scheduling with MTO production strategy, the objective function of which is to maximize the total net profit of the accepted orders. The problem is formulated as an integer-programming (IP) model, and a cloud-based simulated annealing (CSA) algorithm is developed to solve the problem. Based on the number of candidate orders the firm receives, fifteen problems are generated. Each problem is regarded as an experiment, which is conducted five times to compare the efficiency of the proposed CSA algorithm to the one of simulated annealing (SA) algorithm previously suggested for the problem. The experimental results testify to the improvement in objective function values yielded by CSA algorithm in comparison with the ones produced by the formerly proposed SA algorithm.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Optimizing Bicriteria Flow Shop Scheduling Problem By Simulated Annealing Algorithm

We consider the flow shop scheduling problem with minimizing two criteria simultaneously: the total completion time (makespan) and the sum of tardiness of jobs. The problem is strongly NP-hard, since for each separate criteria the problem is strongly NP-hard. There is a number of heuristic algorithms to solve the flow shop problem with various single objectives, but usage of those heuristics to...

full text

MILP Formulation and Genetic Algorithm for Non-permutation Flow Shop Scheduling Problem with Availability Constraints

In this paper, we consider a flow shop scheduling problem with availability constraints (FSSPAC) for the objective of minimizing the makespan. In such a problem, machines are not continuously available for processing jobs due to preventive maintenance activities. We proposed a mixed-integer linear programming (MILP) model for this problem which can generate non-permutation schedules. Furthermor...

full text

A Simulated Annealing Algorithm for Multi Objective Flexible Job Shop Scheduling with Overlapping in Operations

In this paper, we considered solving approaches to flexible job shop problems. Makespan is not a good evaluation criterion with overlapping in operations assumption. Accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. As overlapping in operations is a practical assumption in chemical, petrochemical, and gla...

full text

Multi-population and Self-adaptive Genetic Algorithm Based on Simulated Annealing for Permutation Flow Shop Scheduling Problem

In order to solve the permutation flow shop scheduling problem, a multipopulation and self-adaptive genetic algorithm based on simulated annealing is proposed in this paper. For the precocity problem of traditional genetic algorithm, the multi-population coevolution strategy is adopted. We introduce a squared term to improve traditional self-adaptive genetic operators, which can increase the se...

full text

The Development of Simulated Annealing Algorithm for Hybrid Flow Shop Scheduling Problem to Minimize Makespan and Total Tardiness

Hybrid Flowshop Scheduling (HFS) is one of the most comprehensively studied in scheduling problems. HFS has m-machines in each stage so that it is more complicated that regular flowshop scheduling. There are several production systems using HFS, such as steel manufacture, textile, and paper industry [8] [15]. Makespan and total tardiness are two important goals in scheduling to make the schedul...

full text

milp formulation and genetic algorithm for non-permutation flow shop scheduling problem with availability constraints

in this paper, we consider a flow shop scheduling problem with availability constraints (fsspac) for the objective of minimizing the makespan. in such a problem, machines are not continuously available for processing jobs due to preventive maintenance activities. we proposed a mixed-integer linear programming (milp) model for this problem which can generate non-permutation schedules. furthermor...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 1  issue 1

pages  1- 19

publication date 2014-11-01

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023