مدل سازی و حل مساله زمانبندی کار کارگاهی با زمانهای آماده‌سازی وابسته به توالی

Authors

Abstract:

  In recent decade, many researches has been done on job shop scheduling problem with sequence dependent setup times (SDSJSP), but with respect to the knowledge of authors in very few of them the assumption of existing inseparable setup has been considered. Also, in attracted metaheuristic algorithms to this problem the Particle Swarm Optimization has not been considered. In this paper, the ISDSJSP with makespan minimization is considered. For this problem an MILP model has been developed and a PSO algorithm has been applied to solve it. In order to improve final solution obtained by PSO a simulated annealing algorithm has been applied. The proposed hybrid algorithm (HPSO) has been applied on some generated benchmark problems and the results indicate the effectiveness and efficiency of the proposed hybrid PSO with respect to two other algorithms

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

مدل سازی و حل مساله زمانبندی کار کارگاهی با زمانهای آماده سازی وابسته به توالی

در یک دهه اخیر تحقیقات نسبتا کمی بر روی مساله زمانبندی کار کارگاهی با زمان های آماده سازی وابسته به توالی جدایی ناپذیر (isdsjsp) انجام شده است. در زمینه حل این مساله نیز الگوریتم بهینه سازی دسته ذرات (pso) مورد توجه قرار نگرفته است. در این مقاله مساله isdsjsp با تابع هدف کمینه سازی زمان پایان تمام کارها مدنظر قرار گرفته و یک مدل برنامه ریزی خطی عدد صحیح مختلط و یک الگوریتم ترکیبی pso برای آن ار...

full text

بکارگیری الگوریتم ترکیبی بهینه سازی دسته ذرات برای حل مساله سنتی زمانبندی کار کارگاهی

The classical Job Shop Scheduling Problem (JSSP) is NP-hard problem in the strong sense. For this reason,   different metaheuristic algorithms have been developed for solving the JSSP in recent years. The Particle Swarm Optimization (PSO), as a new metaheuristic algorithm, has applied to a few special classes of the problem.  In this paper, a new PSO algorithm is developed for JSSP. First, a pr...

full text

زمانبندی جریان کارگاهی مونتاژ با زمان آماده‌سازی وابسته به توالی و زمان حمل و نقل

In this paper, three-stage assembly flowshop scheduling is considered with respect to minimizing bi-objectives, namely mean flow time and mean tardiness. This problem is a model of production systems, which several production operations are done simultaneously and independently, and then produced components are collected and transferred to an assembly stage for the final operation. In this mode...

full text

مدل سازی مساله زمانبندی تولید جریان کارگاهی چند حالته با منابع محدود

در مسائل زمانبندی معمولا زمان پردازش عملیات های هر کار مشخص و ثابت در نظر گرفته می شود. درادبیات زمانبندی پروژه بسیار تاکید شده است که زمان هر فعالیت/عملیات می تواند گاهی چند حالته باشد و باتخصیص مقداری بیشتری از منابع به یک فعالیت، زمان پردازش آن نیز کاهش یابد. در اینگونه مسائل علاوه برزمانبندی فعالیت ها باید تخصیص منابع محدود در دسترس به فعالیت ها نیز انجام شود. این ضعف در ادبیاتمسائل زمانبند...

full text

مدل های عمومی برای مسائل توالی جریان کارگاهی ترکیبی با زمان های آماده سازی وابسته به توالی

در این مقاله دو مدل برنامه ریزی مختلط عدد صحیح (MILP) برای جریان کارگاه ترکیبی (HFS) با زمان های آماده سازی وابسه به توالی ارائه می شود. در مدل اول فرض شده که ماشین های موجود در هر مرحله یکسان (I) بوده اما در مدل دوم این ماشین ها مختلف در نظر گرفته شده اند. همچنین در این مقاله تفاوت بین مدلهای ارائه شده بر اساس راحتی بکارگیری و نیز قابلیت توسعه و مسائل گوناگون مورد بحث قرار گرفته است. یکی از مه...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 21  issue 4

pages  103- 115

publication date 2011-01

By following a journal you will be notified via email when a new issue of this journal is published.

Keywords

No Keywords

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023