روش ترکیبی جدید برای حل مسئله زمان‌بندی کار کارگاهی انعطاف‌پذیر در شرایط چندهدفی به وسیله خوشه‌بندی پویا و کارای فضای جستجو

Authors

Abstract:

This article doesn't have abstract

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

حل مسأله زمان‌بندی کار کارگاهی چندهدفی انعطاف‌پذیرِ پویا به وسیله الگوریتم ژنتیک توسعه‌یافته

In this paper, Multi-Objective Flexible Job-Shop scheduling with Parallel Machines in Dynamic manufacturing environment (MO-FDJSPM) is investigated. Moreover considering dynamical job-shop environment (jobs arrived in non-zero time), It contains two kinds of flexibility which is effective for improving operational manufacturing systems. The non-flexibility leads to scheduling program which have...

full text

بهبود حافظه برای حل مسئله زمان‌بندی کار کارگاهی پویا

وقتی با یک جهان در حال تغییر مواجه می‌شوید، انسان‌ها نه‌تنها به آینده بلکه به گذشته هم توجه می‌کنند. توجه کردن به راه‌حل‌های مشابه، به ما در تصمیم‌گیری در آینده کمک می‌کند. زمانی‌که با وضعیتی روبرو می‌شویم که قبلاً آن را تجربه کرده باشیم بهتر می‌توانیم با آن روبرو شویم. اگر در حل مسائل بهینه‌سازی با ماهیتی پویا در هنگام جستجو، از اطلاعات گذشته داخل بهینه‌سازی و یادگیری استفاده شود، می‌تواند به ف...

full text

حل مسأله زمان بندی کار کارگاهی چندهدفی انعطاف پذیرِ پویا به وسیله الگوریتم ژنتیک توسعه یافته

تحقیق حاضر، علاوه بر پارامترهای پویایی و انعطاف پذیری، چندمعیاره بودن تابع هدف را نیز درنظر می گیرد. مسائل زمان بندی ماهیتاً مسائل پویای بوده و لحاظ نمودن انواع انعطاف پذیری ها در این قبیل مسائل، منجر به رفع مشکلات گلوگاهی، افزایش تولید، بهبود عملکرد سیستم و ایجاد مزیت رقابتی می شود. از سویی دیگر برای دستیابی به اهداف سازگار با فلسفه تولید بموقع و اهداف مدیریتی زنجیره تامین، اهداف زمان بندی در ا...

full text

الگوریتم ممتیک برای حل مسئله زمانبندی کار کارگاهی منعطف با امکان ایجاد وقفه در انجام فعالیت‌ها

Flexible job shop scheduling problem )FJSP( is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. FJSP is NP-hard and mainly presents two difficulties. The first one is to assign each operation to a machine out of a set of capable machines, and the second one deals with sequencing the assigned operations on the ma...

full text

بکارگیری الگوریتم ترکیبی بهینه سازی دسته ذرات برای حل مساله سنتی زمانبندی کار کارگاهی

The classical Job Shop Scheduling Problem (JSSP) is NP-hard problem in the strong sense. For this reason,   different metaheuristic algorithms have been developed for solving the JSSP in recent years. The Particle Swarm Optimization (PSO), as a new metaheuristic algorithm, has applied to a few special classes of the problem.  In this paper, a new PSO algorithm is developed for JSSP. First, a pr...

full text

توسعه روش های فراابتکاری برای حل مسئله زمانبندی نیروی انسانی در محیط جریان کارگاهی

در این تحقیق مسئله یکپارچه زمانبندی کارها و نیروی انسانی در محیط جریان کارگاهی مورد بررسی قرار گرفته است که در آن تعدادی نیروی انسانی با مهارت‌های مختلف وجود دارند که قابلیت انجام کارهای متفاوت با سرعت‌های مختلف را دارند. هدف مسئله تعیین زمانبندی کارها در مراحل مختلف و تخصیص نیروی انسانی به این مراحل است به‌گونه‌ای که بیشنه زمان تکمیل کارها (Cmax) کمینه شود. برای این منظور یک مدل ریاضی خطی عدد ...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 26  issue 2

pages  203- 216

publication date 2015-08

By following a journal you will be notified via email when a new issue of this journal is published.

Keywords

No Keywords

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023