splittable stochastic project scheduling with constrained renewable resource

Authors

s.s hashemin

s.m.t fatemi ghomi

abstract

this paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. if the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. it is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. the activity duration time is assumed to be a dis-crete random variable with arbitrary experimental distribution. solving stochastic mathematical programming model of problem is very hard. so, here some existing methods for deterministic problems have been gener-alized for stochastic case. solutions of generalized methods are relatively better than random solutions. how-ever, the authors developed the new algorithm that may improve the solutions of generalized methods and project completion time distribution function (ctdf). comparison of solution of a method with random solutions is a common assessment method in literature research. hence, the efficiency of the proposed algo-rithm represented using this method.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Splittable stochastic project scheduling with constrained renewable resource

This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...

full text

Stochastic Resource-constrained Project Scheduling

PREFACE After having received my diploma from the Technische Universität Berlin in 1996, Rolf Möhring, the supervisor of my diploma thesis, offered me a research position in his group. At that time I was employed at a Berlin software company the head of which, Gert Scheschonk, strongly encouraged me to accept the offer. I accepted and in 1997 I began to work within a research initiative funded ...

full text

The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...

full text

Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources

Project success is assessed based on various criteria, every one of which enjoys a different level of importance for the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for the project success. On the other hand, reducing the risk of finishing activities until the predetermined deadlines should be taken into account. Having formulated the problem ...

full text

Stochastic Resource-Constrained Project Scheduling and Its Military Applications

author biographies Dr. William P. Fox is a professor in the Department of Defense Analysis at the Naval Postgraduate School. He received his BS degree from the United States Military Academy at West Point, New York, his MS at the Naval Postgraduate School, and his PhD at Clemson University. Previous he has taught at the United States Military Academy and Francis Marion University, where he was ...

full text

Resource-Constrained Project Scheduling with Genetic Algorithm

The purpose of this paper presents a heuristic method based in genetic algorithms (GA) for resource-constrained project scheduling. The problem studied was of the scheduling of projects that share the same pool of resources. This situation is very common in some environments of project, i. e., construction P&D units. Fluctuation in resource usage can result in many problems, such as the need in...

full text

My Resources

Save resource for easier access later


Journal title:
journal of industrial engineering, international

ISSN 1735-5702

volume 2

issue 2 2006

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023