bicriteria scheduling in hybrid flow shop with unrelated parallel machines
Authors
abstract
this study considers scheduling in hybrid flow shop environment with unrelated parallel machines for minimizing mean of job's tardiness and mean of job's completion times. this problem does not study in the literature, so far. flexible flow shop environment is applicable in various industries such as wire and spring manufacturing, electronic industries and production lines. after modeling the problem as a mixed integer programming model, three heuristics named cluster, h1 and h2 is proposed for solving it. the first heuristic (cluster) algorithm utilizes clustering methods for determining sequence of jobs. the second and third heuristics (h1 and h2) determine sequence of jobs with using spt and edd rules, respectively. the experimental results of study show that cluster algorithm outperforms h1 and h2.
similar resources
Heuristic approach to solve hybrid flow shop scheduling problem with unrelated parallel machines
In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are processed on k machines. A mixed integer linear programming (MILP) model for the HFS scheduling problems with unrelated parallel machines has been proposed to minimize the maximum completion time (makespan). Since the problem is shown to be NP-complete, it is necessary to use heuristic methods to ...
full textFlexible flowshop scheduling with equal number of unrelated parallel machines
This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly ge...
full textA comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times
In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...
full textA New Lower Bound for Flexible Flow Shop Problem with Unrelated Parallel Machines
Flexible flow shop scheduling problem (FFS) with unrelated parallel machines contains sequencing in flow shop where, at any stage, there exists one or more processors. The objective consists of minimizing the maximum completion time. Because of NP-completeness of FFS problem, it is necessary to use heuristics method to address problems of moderate to large scale problem. Therefore, for assessme...
full textSequencing Heuristics for Flexible Flow Shop Scheduling Problems with Unrelated Parallel Machines and Setup Times
This paper presents an investigation of scheduling procedures to seek the minimum of a positively weighted convex sum of makespan and the number of tardy jobs in a static flexible flow shop scheduling environment. The flexible flow shop problem is a scheduling of jobs in a flow shop environment consisting of series of production stages, some of which may have only one machine, but at least one ...
full textSolving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization
This paper considers a scheduling problem of a set of independent jobs on unrelated parallel machines (UPMs) that minimizesthe maximum completion time (i.e., makespan or ), maximum earliness ( ), and maximum tardiness ( ) simultaneously. Jobs have non-identical due dates, sequence-dependent setup times and machine-dependentprocessing times. A multi-objective mixed-integer linear programmi...
full textMy Resources
Save resource for easier access later
Journal title:
نشریه دانشکده فنیجلد ۴۱، شماره ۱۰، صفحات ۰-۰
Keywords
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023