Constrained Consumable Resource Allocation in Uncertain Project Networks with Fuzzy Activity Duration
full text
constrained consumable resource allocation in uncertain project networks with fuzzy activity duration
0
full textConstrained consumable resource allocation in alternative stochastic networks via multi-objective decision making
Many real projects complete through the realization of one and only one path of various possible network paths. Here, these networks are called alternative stochastic networks (ASNs). It is supposed that the nodes of considered network are probabilistic with exclusive-or receiver and exclusive-or emitter. First, an analytical approach is proposed to simplify the structure of t...
full textA UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS
In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...
full textA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
full textConstrained Renewable Resource Allocation in Fuzzy Metagraphs via Min-Slack
This paper discusses that the fuzzy metagraphs can be used as a tool for scheduling and control of fuzzy projects. Often, available resources for executing projects may be limited. It is assumed the resources required to accomplish each activity of project (metagraph edges) is renewable. One of the common methods for scheduling projects is using the min-slack. So, first, the forward and bac...
full textMy Resources
Save resource for easier access later
Journal title:
international journal of industrial mathematicsPublisher: science and research branch, islamic azad university, tehran, iran
ISSN 2008-5621
volume 2
issue 2 2010
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023