genetic algorithms for assembly line balancing problem

Authors

نظام الدین فقیه

محمد مهدی منتظری

abstract

there are some machineries and equipments as well as relatively fix amount of human resources involved in any production process. in many cases, by observing operational method of a process, one may see that some of these machineries are not working, but on the other hand, other equipments are continuously working, and many parts are set in front of them, waiting to be set up over machines to continue production procedure. existence of non-working time as well as overload tasks, that means imbalance in production process, are among factors creating some problems for system’s management.one guideline that a manager may use to encounter imbalance problem of production process is assembly line balancing.in this thesis, genetic algorithm method is used to solve assembly line balance problem. this algorithm presents a new method during execution of crossover operation and combination of parent chromosomes in order to produce child and mutation building in chromosomes. finally, efficiency of obtained answers by genetic algorithm is compared with numeric method.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

A Bi-Objective Approach to an Assembly Line Re-Balancing Problem: Model and Differential Evolution Algorithms

Assembly lines are special kinds of production systems which are of great importance in the industrial production of high quantity commodities. In many practical manufacturing systems, configuration of assembly lines is fixed and designing a new line may be incurred huge amount of costs and thereby it is not desirable for practitioners. When some changes related to market demand occur, it is wo...

full text

a bi-objective approach to an assembly line re-balancing problem: model and differential evolution algorithms

assembly lines are special kinds of production systems which are of great importance in the industrial production of high quantity commodities. in many practical manufacturing systems, configuration of assembly lines is fixed and designing a new line may be incurred huge amount of costs and thereby it is not desirable for practitioners. when some changes related to market demand occur, it is wo...

full text

Genetic Algorithms for Combinatorial Optimization: The Assemble Line Balancing Problem

Genetic algorithms are one example of the use of a random element within an algorithm for combi-natorial optimization. We consider the application of the genetic algorithm to a particular problem, the Assembly Line Balancing Problem. A general description of genetic algorithms is given, and their specialized use on our test-bed problems is discussed. We carry out extensive computational testing...

full text

Multi-objective fuzzy assembly line balancing using genetic algorithms

This paper presents a fuzzy extension of the simple assembly line balancing problem of type 2 (SALBP-2) with fuzzy job processing times since uncertainty, variability, and imprecision are often occurred in real-world production systems. The jobs processing times are formulated by triangular fuzzy membership functions. The total fuzzy cost function is formulated as the weighted-sum of two bi-cri...

full text

A cost-oriented model for multi-manned assembly line balancing problem

In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...

full text

Assembly line balancing to minimize balancing loss and system loss

Assembly Line production is one of the widely used basic principles in production system. The problem of Assembly Line Balancing deals with the distribution of activities among the workstations so that there will be maximum utilization of human resources and facilities without disturbing the work sequence. Research works reported in the literature mainly deals with minimization of idle time i.e...

full text

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023