solving the resource-constrained project scheduling problems (rcpsp) using developed imperialistic competition algorithm (dica)

Authors

حسین صفری

دانشیار، مدیریت صنعتی، دانشکدۀ مدیریت دانشگاه تهران، تهران، ایران علیرضا فقیه

دانشجوی دکتری مدیریت گرایش تحقیق در عملیات، دانشکدۀ مدیریت، دانشگاه تهران، تهران، ایران

abstract

the scheduling problems are the non-polynomial problems-hard (np-hard), is to solve it, and meta-heuristic innovative method compared with the exact method require less time and memory.in this research, developed imperialistic competitive algorithm used to solving the single-mode resource-constrained project scheduling problem.also the basic feasible solution algorithm used in order to increase the rate of developed imperialist competetive algorithm by remove the unfeasible search space. the proposed algorithm is tested on a set of standard problems psplib library and the performance is compared with some existing methods. test results of the proposed algorithm show effectiveness and feasibility of algorithm to solve standard problems. to evaluate the performance of algorithms for solving problems in real field, two projects that carried out by the quds force (supplies petrochemicals project in kermanshah, kermanshah petrochemical project setup utility) are modeling in rcpsp and solved by using the proposed algorithm.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Solving the Unit Commitment Problem Using Modified Imperialistic Competition Algorithm

One of the most important problems for power system operation is unit commitment (UC), for which different constraints should be satisfied. UC is a nonlinear and large-scale problem; thus, using the evolutionary algorithms has been considered for solving the problem. In this paper, the solution of the UC problem was investigated using Modified Imperialistic Competition Algorithm (MICA).  Simula...

full text

Solving “Resource Constrained Project Scheduling Problem” (RCPSP) with Bench Marked Hybrid Algorithm’s

In the paper, we give illustrated reviews, new approaches and results of how rcps –problems are being solved with Hybrid algorithm’s. Firstly, considering Hybrid Genetic Algorithm (HGA), Vicente a et al 2007, introducing many changes in Genetic algorithm (GA) paradigm, resulting in HGA giving fast and high quality algorithms out performing state-of-the-art-algorithm (SOTAA). for rcps-problem. S...

full text

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

full text

A Genetic Algorithm for the Resource Constrained Project Scheduling Problem (rcpsp)

This paper proposes a Genetic Algorithm for the Resource Constrained Project Scheduling Problem (RCPSP). Resources are renewable and there is a unique way to perform the activities. This work employs Genetics Algorithms to schedule project activities to minimize makespan subject to precedence constraints and resources availability. A serial generation scheme is used to obtain the schedule. The ...

full text

A Multi-objective Scheduling Model for Solving the Resource-constrained Project Scheduling and Resource Leveling Problems

The project resource leveling problem was proposed to smooth resource usage and reduce resource fluctuation, while the resource-constrained project scheduling problem focuses on minimizing the project duration with limited resources. Solving the two interrelated problems separately is unlikely to result in a globally optimum schedule. The few integrated optimization methods that have been devel...

full text

The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...