Techniques for Evaluating the Performance of Pre-timed Ramp Meters Using Archived Its Data

نویسندگان

  • Robert L. Bertini
  • Ahmed El-Geneidy
چکیده

TECHNIQUES FOR EVALUATING THE PERFORMANCE OF PRE-TIMED RAMP METERS USING ARCHIVED ITS DATA Robert L. Bertini Civil & Environmental Engineering Portland State University P.O. Box 751 Portland, OR 97207-0751 Phone: 503-725-4249 Fax: 503-725-5950 Email: [email protected] Ahmed El-Geneidy Center for Urban Studies Portland State University P.O. Box 751 Portland, OR 97207-0751 Phone: 503-725-5946 Fax: 503-725-8480 Email: [email protected] ABSTRACT Pre-Timed Ramp Metering (PRM) is a traffic management technique. The Oregon Department of Transportation (ODOT) currently operates a comprehensive Advanced Traffic Management System (ATMS). ATMS collects data from various sources and archives it for later usage. In this paper we demonstrate several techniques for measuring and assessing the performance of Portland, Oregon’s existing PRM system. These techniques can help departments of transportation (DOTs) in locations where PRM has been applied to measure the performance of their systems. This type of analysis uses data that are already being collected as part of an overall Intelligent Transportation System (ITS) deployment.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

USING ARCHIVED ITS DATA TO MEASURE THE OPERATIONAL BENEFITS OF A SYSTEM-WIDE ADAPTIVE RAMP METERING SYSTEM Final Report USING ARCHIVED ITS DATA TO MEASURE THE OPERATIONAL BENEFITS OF A SYSTEM-WIDE ADAPTIVE RAMP METERING SYSTEM

A System-Wide Adaptive Ramp Metering (SWARM) system has been implemented in the Portland, Oregon metropolitan area, replacing the previous pre-timed ramp-metering system that had been in operation since 1981. SWARM has been deployed on six major corridors and operates during the morning and afternoon peak hours. This report presents results of a " before " and " after " evaluation of the perfor...

متن کامل

Increasing the accuracy of the classification of diabetic patients in terms of functional limitation using linear and nonlinear combinations of biomarkers: Ramp AUC method

The Area under the ROC Curve (AUC) is a common index for evaluating the ability of the biomarkers for classification. In practice, a single biomarker has limited classification ability, so to improve the classification performance, we are interested in combining biomarkers linearly and nonlinearly. In this study, while introducing various types of loss functions, the Ramp AUC method and some of...

متن کامل

EVALUATING EFFECTIVENESS OF RAMP METERS Evidence from the Twin Cities Ramp Meter Shut-off

Ramp meters in the Twin Cities have been turned off for eight weeks in fall 2000 in an experiment testing their effectiveness. This chapter analyzes the data collected during the experiment on several representative freeways during the afternoon peak period. Several performance measures for ramp metering including mobility, equity, consumers’ surplus, productivity, accessibility, and travel tim...

متن کامل

Empirical Evaluation of Freeway Corridor Performance Before and After System-Wide Adaptive Ramp Metering System Implementation

A System-Wide Adaptive Ramp Metering (SWARM) system has been implemented in the Portland, Oregon metropolitan area, replacing the previous pre-timed ramp-metering system that had been in operation since 1981. SWARM has been deployed on six major corridors and operates during the morning and afternoon peak hours. This paper reports on the results of a “before” and “after” evaluation of the perfo...

متن کامل

Evaluating the Benefits of a System-Wide Adaptive Ramp-Metering Strategy in Portland, Oregon

A System-Wide Adaptive Ramp Metering (SWARM) system is being implemented in the Portland metropolitan area, replacing the previous pre-timed ramp-metering system. SWARM has been deployed on six major corridors and operates during the morning and afternoon peak hours. This study entails a ―before‖ and ―after‖ evaluation of the benefit of the new SWARM system as compared to the pre-timed system u...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004