Estimating post- and pre-mitigation contingency in construction

نویسنده

  • A. Salah
چکیده

Contingency is necessary to mitigate and control risk associated with construction projects. Successful contingency estimation and risk mitigation strategies can help project managers to effectively control cost and schedule. Some practitioners mitigate risk by transferring it to another party with less effort and minimum cost. However, this may lead to undesirable results such as; useless depletion of contingency, cost overrun, and project delay. This paper differentiates between two types of project contingency; pre-mitigation, and post-mitigation. It also proposes a new estimation method for pre-mitigation and post mitigation contingencies using fuzzy set theory. The proposed pre-mitigation contingency estimation makes use of qualitative and quantitative assessment of risks associated with projects. Post mitigation contingency (POSTMC) estimation makes use of newly introduced planned efficiency factor (PEF). That factor is calculated using mitigation strategy cost, pre-mitigation contingency (PREMC) and several sub-factors such as; mitigation efficiency on probability (MEFP), mitigation efficiency on consequences (MEFC), and mitigation efficiency (MEF). This paper provides a decision support tool; expected to help project managers in estimating and evaluating pre-mitigation and post mitigation contingencies using a set of strategies during project life cycle. The evaluation of post mitigation efficiency allows user to update the risk mitigation plan (i.e. risk response plan) for future projects. In addition to that, it allows users to maximize profit and minimize cost without compromising the efficiency of the selected risk mitigation strategies. Numerical example is presented to illustrate the application and capabilities of proposed method in estimation the pre-mitigation and post mitigation contingency. It also Risk Analysis IX 243 www.witpress.com, ISSN 1743-3517 (on-line) WIT Transactions on Information and Communication Technologies, Vol 47, © 2014 WIT Press doi:10.2495/RISK140211 demonstrates the capacity of the proposed method in selecting most effective mitigation strategies for risks associated with the project.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Maturing Concept of Estimating Project Cost Contingency - a Review

Contingency is a ubiquitous component of project cost estimating. This paper provides a review of the literature pertaining to the estimating of project cost contingency. It describes the flaws of the tradition percentage method for estimating project cost contingency and sets out more robust estimation methods regression analysis, Monte Carlo simulation and artificial neutral networks. In part...

متن کامل

Radon mitigation in domestic properties and its health implications--a comparison between during-construction and post-construction radon reduction.

Although United Kingdom (UK) Building Regulations applicable to houses constructed since 1992 in Radon Affected Areas address the health issues arising from the presence of radon in domestic properties and specify the installation of radon-mitigation measures during construction, no legislative requirement currently exists for monitoring the effectiveness of such remediation once construction i...

متن کامل

Letter to the Editor: Application of Haddon Matrix in Disaster Management: A New Window in Disaster Mitigation Risk

In recent years, disaster management has been the focus of attention since disasters have been associated with huge destructions and consequences. Basically, disaster management techniques aim at the prevention and mitigation works as well as promotion of resilience. Haddon’s matrix was proposed as a conceptual model to understand the event and provide preventive measures in the field of injur...

متن کامل

Fuzzy Set-based Contingency Estimating and Management

Purpose Contingency estimating and management are critical management functions necessary for successful delivery of construction projects. Considering its importance, academics and industry professionals proposed a wide range of methods for risk quantification and accordingly for contingency estimating1. Considerably less work was directed to contingency management including risk mitigate duri...

متن کامل

A Review on Crude Oil Fouling and Mitigation Methods in Pre-heat Trains of Iranian Oil Refineries

Crude oil fouling of the equipment surfaces is a troublesome issue which leads to operating difficulties, economic penalties, increased environmental impacts, and health and safety hazards in petroleum industry. With a rough estimation, a minimum cost of equal to 4 million barrels of oil/year is required to be invested to offset the costs of crude oil fouling in Pre-heat Trains of Iranian oil r...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014