Intraday Optimization of Pumped Hydro Power Plants in the German Electricity Market ¬リニ

نویسندگان

  • Sebastian Braun
  • Rainer Hoffmann
چکیده

Historically, the optimal production of hydro power plants was determined once day ahead. Today, many regulatory requirements in the German electricity market make this process much more complex: Power plant operators are committed to report information on planned production and even on provision of balancing energy of each single generator to transmission system operators. As soon as a deviation in the schedule occurs, the information hast to be updated and reported again. These requirements lead to the point where optimization of pumped hydro power plants can no longer be done manually. In order to fulfil these requirements, EnBW has developed its own optimization model and established a system-based day ahead and intraday asset optimization process. The optimization problem is formulated as a mixed integer problem which determines the minimum operating cost subject to all technical constraints of a hydrothermal portfolio and covering load. As a post-optimization of this new intraday optimization system we set up an effective multistage looping optimization algorithm for daily pumped hydro power plants considering e. g. reservoir limits, quarter-hourly prices, grid charges and availabilities. A real world case study is presented and discussed. © 2016 The Authors. Published by Elsevier Ltd. Peer-review under responsibility of SINTEF Energi AS.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Development of the methodology for the evaluation of a hydro-pumped storage power plant: Swiss case study

During the last two decades, an evolving market structure is recognised starting from the spot market and its derivatives, resulting to several other markets such as the Intraday Market (IM), the Balancing Market (BM) and the Reserve Capacity Market (RCM). The participation in these markets has changed significantly the operation policy of the plants and, consequently, their value in the market...

متن کامل

Optimal Short-Term Coordination of Desalination, Hydro and Thermal Units

The fossil fuels consumption is rapidly growing due to increased water and electricity demands. An interconnected water-energy nexus is generally composed of thermal power plants, combined potable water and power (CWP) generation units, and desalination only processes. Hence, participation of hydro power plants in electricity generation facilities not only reduces the total fuel consumption of ...

متن کامل

Stochastic Unit Commitment in Hydro-Thermal Power Production Planning

Economic needs and the ongoing liberalization of European electricity markets stimulate the interest of power utilities in developing models and optimization techniques for the generation and trading of electric power under uncertainty. Utilities participating in deregulated markets observe increasing uncertainty in load (i.e., demand for electric power) and prices for fuel and electricity on s...

متن کامل

Introduce an Optimal Pricing Strategy Using the Parameter of "Contingency Analysis" Neplan Software in the Power MarketCase Study (Azerbaijan Electricity Network)

Overall price optimization strategy in the deregulated electricity market is one of the most important challenges for the participants, In this paper, we used Contingency Analysis Module of NEPLAN Software, a strategy of pricing to market participants is depicted.Each of power plants according to their size and share of the Contingency Analysis should be considered in the price of its hour. In ...

متن کامل

Study of hybrid wind-hydro power plants operation and performance in the autonomous electricity system of Crete Island

This work analyses the configuration and operation principles of hybrid wind-hydro power plants with pumped storage integrated into autonomous electric grid systems, in order to support high wind energy penetration. The plant consists of wind generation units, combined with a pumped-hydro storage system. It operates on a daily basis, storing the surplus wind production by pumping water in an el...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016