Project Planning: Improved approach incorporating uncertainty
نویسنده
چکیده
Project planning inevitably involves uncertainty. The basic input parameters for planning (time, cost and resources for each activity) are not deterministic and are affected by various sources of uncertainty. Moreover, there is a causal relationship between these uncertainty sources and project parameters; this causality is ignored in current state-of-the-art project planning techniques (such as simulation techniques). In this paper we present an approach, using Bayesian network modelling, that addresses both uncertainty and causality in project management. Bayesian networks have been widely used in a range of decision-support applications, but the application to project management is novel. The model we present empowers the traditional Critical Path Method (CPM) to handle uncertainty and also provides explanatory analysis to elicit, represent, and manage different sources of uncertainty in project planning.
منابع مشابه
A practical approach to open-pit mine planning under price uncertainty using information gap decision theory
In the context of open-pit mine planning, uncertainties including commodity price would significantly affect the technical and financial aspects of mining projects. A mine planning that takes place regardless of the uncertainty in price just develops an optimized plan at the starting time of the mining operation. Given the price change over the life of mine, which is quite certain, optimality o...
متن کاملDynamic Planning the Expansion of Electric Energy Distribution Systems Considering Distributed Generation Resources in the Presence of Power Demand Uncertainty
In this paper, a new strategy based on a dynamic (time-based) model is proposed for expansion planning of electrical energy distribution systems, taking into account distributed generation resources and advantage of the techno-economic approach. In addition to optimal placement and capacity, the proposed model is able to determine the timing of installation / reinforcement of expansion options....
متن کاملProject Scheduling: Improved Approach to Incorporate Uncertainty Usinc Bayesian Networks
project scheduling inevitably involves uncertainty. The basic inputs (i.e., time, cost, and resources for each activity) are not deterministic and are affected by various sources of uncertainty. Moreover, there is a causal relationship between these uncertainty sources and project parameters; this causality is not modeled in current state-of-the-art project planning techniques {such as simulati...
متن کاملImproved Binary Particle Swarm Optimization Based TNEP Considering Network Losses, Voltage Level, and Uncertainty in Demand
Transmission network expansion planning (TNEP) is an important component of power system planning. Itdetermines the characteristics and performance of the future electric power network and influences the powersystem operation directly. Different methods have been proposed for the solution of the static transmissionnetwork expansion planning (STNEP) problem till now. But in all of them, STNEP pr...
متن کاملDetermination of Ultimate Pit Limits in Open Mines Using Real Option Approach
Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and impose...
متن کامل