Longitudinal and Transverse Feedback Kickers for the Bessy Ii Storage Ring∗
نویسندگان
چکیده
This paper presents an overview of the bunch-by-bunch feedback kickers designed for the BESSY II storage ring. Simulation results for the longitudinal kicker cavity and for the transverse stripline kicker are discussed.
منابع مشابه
Bunch-by-bunch Feedback and Diagnostics at Bessy Ii
At the light source BESSY II new digital bunch-bybunch feedback systems [1] have been put into operation in January 2013, replacing the existing analog as well as the obsolete digital systems. From the first days of operation the new system successfully suppresses transverse and longitudinal beam instabilities in wide range of machine parameters. The system offers also many new diagnostics oppo...
متن کاملAnalysis of Coupled Bunch Instabilities in Bessy-vsr
BESSY-VSR, a scheme where 1.5 ps and 15 ps long bunches (rms) can be stored simultaneously in the BESSY II storage ring has recently been proposed [1]. The strong longitudinal bunch focusing is achieved by superconducting high gradient RF cavities. This paper presents investigations of coupled bunch instabilities driven by HOMs of superconducting multi-cell cavities in BESSY-VSR. Analytical cal...
متن کاملBessy Ii Feedback Systems
The present status of feedback systems to counteract unwanted beam motion and coupled-bunch beam instabilities in the BESSY II storage ring is reviewed.
متن کاملSingle Particle Tracking for Simultaneous Long and Short Electron Bunches in the Bessy Ii Storage Ring∗
A scheme where 1.5 ps and 15 ps long bunches (rms) can be stored simultaneously in the BESSY II storage ring has recently been proposed (BESSY [1]). This paper presents simulations of single particle beam dynamics influenced by superconducting cavities used for the strong longitudinal beam focusing. The effect of RF jitter on (very short) bunches is investigated and results are discussed. Furth...
متن کاملOrbit Measurements at the Bessy Ii Booster in Preparation for Quasi-low Alpha Operation
Diagnostic refurbishments are ongoing at the booster synchrotron in preparation for the near future Variable pulse Storage Ring (VSR) project at BESSY II. Essential orbit measurements have been re-installed after almost two decades of latency. This diagnostic will help assess the effectiveness of possible upgrade scenarios such as quasi-low alpha operation and extraction optimization. The contr...
متن کامل