This paper introduces some advanced genetic algorithms for a complex hybrid flexible flow line problem with a makespan objective that was recently formulated. General precedence constraints among jobs are taken into account, as are machine release dates, time lags and sequence dependent set-up times; both anticipatory and non-anticipatory. This combination of constraints captures many real world industrial problems; among those is the ceramic tile production that served as our inspiration. The introduced algorithms employ solution representation schemes with different degrees of directness. Several new machine assignment rules are introduced and implemented in some proposed genetic algorithms. The different genetic algorithms are compared among each other and to some heuristics as well. The results indicate that simple solution representation schemes result in the best performance, even for complex scheduling problems and that the genetic algorithms lead to a better solution quality than all tested heuristics.
منابع مشابه
Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint
Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...
متن کاملScheduling of a flexible flow shop with multiprocessor task by a hybrid approach based on genetic and imperialist competitive algorithms
This paper presents a new mathematical model for a hybrid flow shop scheduling problem with multiprocessor tasks in which sequence dependent set up times and preemption are considered. The objective is to minimize the weighted sum of makespan and maximum tardiness. Three meta-heuristic methods based on genetic algorithm (GA), imperialist competitive algorithm (ICA) and a hybrid approach of GA a...
متن کاملA Basic Period Approach for Solving the Economic Lot and Delivery Scheduling in Flexible Flow Lines
In this paper, the problem of lot sizing, scheduling and delivery of several items in a two-stage supply chain over a finite planning horizon is studied. Single supplier via a flexible flow line production system (FFL), produces several items and delivers them directly to an assembly facility. Based on basic period (BP) strategy, a new mixed zero-one nonlinear programming model has been develop...
متن کاملScheduling on flexible flow shop with cost-related objective function considering outsourcing options
This study considers outsourcing decisions in a flexible flow shop scheduling problem, in which each job can be processed by either an in-house production line or outsourced. The selected objective function aims to minimize the weighted sum of tardiness costs, in-house production costs, and outsourcing costs with respect to the jobs due date. The purpose of the problem is to select the jobs tha...
متن کاملFinite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups
This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- IJMHeur
دوره 1 شماره
صفحات -
تاریخ انتشار 2010