Traditional economic theory provides a conundrum for pricing large, lumpy infrastructure investments: very different shortand long-run pricing prescriptions. Unless the facility is congested, efficient short run prices should only cover operating costs (short-run marginal cost, SMC); any higher price designed to also recover capital costs would risk inefficient under-utilization. However, if the facility becomes crowded, capital costs should be included in the calculation of user-fees since that burgeoning demand is likely to cause the construction of more capacity, and users should be confronted with the cost-consequences of their decisions. Once additional capacity is completed, however, and if because of the large size of the addition the facility is no longer congested, then price should once again fall to SMC. The resulting jagged pattern of prices offers little assurance to investors of capital costrecovery without a government guarantee, and it may lead to schizophrenic behavior by both customers and potential suppliers. Just because the physical investment is lumpy, should the price pattern also be dichotomous or can a smoother transition be employed? By integrating the use of congestion fees that are based upon the external costs imposed by one user on all others prior to the construction of added capacity, and then by using the same congestion charge to gauge the “willingness-to-pay” for new capacity and to set an “opportunity-cost”-based benchmark for capital cost recovery afterward, a smoother sequence of prices can evolve. The capital cost recovery portion of these prices, whose magnitude is based upon the congestion eliminated, is premised on a long-run, dynamic view of markets and the transitions they can facilitate, and these cost-recovery adders can be combined with “peak-load-pricing” and An early version of this paper was presented at the Hawaii International Conference on Systems Science, 44, Kauai, Hawaii, Jan. 6, 2011. R. E. Schuler (B) Cornell University, Ithaca, NY 14853, USA e-mail: [email protected] 123 Author's personal copy
منابع مشابه
Strategies to Overcome Network Congestion in Infrastructure Systems
Networked Infrastructure systems deliver services and/or products from point to point along the network. Demand for the services provided by such systems is typically cyclic, creating inefficiencies in capacity utilization. Congestion pricing provides incentives to shift demand from peak time periods to lower demand periods. This effectively increases the capacity of the system without the need...
متن کاملThe Expansion of Capital Asset Pricing Factor Models through Pricing Value ، Momentum and stock quality at Tehran stock exchange
Considering the inverse relationship between the value and momentum factors and the lack of simultaneous use of them in capital asset pricing models as well as non-use of stock quality as representative of profitability ans investment factors such as CAPM and Fama and French's three-factor models, the basis of this study is to provide a new functional model has been replacing pricing models o...
متن کاملتخصیص ارزش- محور هزینههای خدمات انتقال برق
Despite the fact that transmission network has a vital role in electricity markets and cost of transmission expansion is considerable, but transmission charges represent a small percentage of power system operating costs. Thus, transmission cost allocation should be a reasonable economic indicator to make decisions on facility allocation, transmission expansion and other similar market tasks. ...
متن کاملReturn on Investment in Transmission Network Expansion Planning Considering Wind Generation Uncertainties Applying Non-dominated Sorting Genetic Algorithm
Although significant private investment is absorbed in different sectors of power systems, transmission sector is still suffering from appropriate private investment. This is because of the pricing policies of transmission services, tariffs, and especially for investment risks. Investment risks are due to the uncertain behaviour of power systems that discourage investors to invest in the transm...