Spatial Multi-Criteria Decision Process to Define Maintenance Priorities of Forest Road Network: an Application in the Italian Alpine Region

نویسندگان

  • Marco Pellegrini
  • Stefano Grigolato
  • Raffaele Cavalli
چکیده

Nacrtak The combination of GIS tools and Analytic Hierarchy Process (AHP) techniques is used to develop a Decision Support System to rank the maintenance priorities of a forest road network according to the actual conditions and needs. The decision-making process is divided into 4 stages. The first stage fixes the objectives of the analysis as the minimization of the sediment production from road surface and the maximization of the social value of the road. The second stage defines the hierarchical structure of the decision problem. At this stage the set of factors (criteria) to maximize each objective and the evaluation methods are defined. At the third stage AHP analysis is applied using a specific application running on ArcGIS, to calculate the evaluation layer that represents the importance of each road according to the set objectives. The values of the evaluation layer are used at the fourth stage to rank the maintenance interventions according to the given benefit. The methodology has been tested in a forest road network with an extension of 107.8 km including in the analysis the real budget constraints and maintenance costs. The results show that the integrated use of GIS and AHP analysis represents a valuable tool to rate the importance of the forest road network for the management of a mountain territory and to define priorities among maintenance operations of the road network, in order to maximize the overall benefit with limited economic resources.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Application of multi-criteria decision making to estimate the potential of flooding

Integrating a geographic information system and multi-criteria decision making methods have been lead to provide spatial multi-criteria decision making methods. In this study, the spatial potential of flooding was determined based on analytic network process and analytic hierarchy process. At first, six factors of flooding were determined as criteria. The criteria were the slope, hill-slope asp...

متن کامل

Classification of Protected Forest Areas for Road Network Planning (Case Study: Arasbaran Area)

The road network is an important element for sustainable forest ecosystem management. On the other hand, efficiency and quality of road design can be improved by considering of environmental and technical principles. Therefore, this study was performed to determine the capability of Arasbaran protected area for road passing and communication routes in order to use in the area management. For th...

متن کامل

Spatial analysis resiliency City Earthquake Model Integration Case study: ten districts of the region one of Tehran

The most devastating earthquake in decades as one of the environmental risks Most damage to property in the city and surrounding areas entered, Since the earthquake as the driving force of the outer fixed To increase the resilience needed to reduce vulnerabilities. This study aimed to assess the resilience of ten districts of the region one of Tehran earthquake has taken place. Methods this cro...

متن کامل

Planning road network in mountain forests using GIS and Analytic Hierarchical Process (AHP)

Forest road construction is the most costly operation in forestry. Road designing and construction in unsuitable areas may increase construction and maintenance costs and also cause many environmental impacts. Therefore, it is required to pay more attention to forest road design. In this research, we tried to introduce an appropriate method for locating forest roads using GIS and AHP simultaneo...

متن کامل

The Application of Multi Attribute Decision Methods (MADM) on prioritizing Iranian fisheries research projects

The ultimate goal of an agriculture research system is on-time, correct and clear response to the problems and expectations of agriculture household and stakeholders. In this respect, though, due to variation and frequency of the problems and expectations and as well as many limitations such as financial deficit, short time and shortage in work force and equipments etc, the system cannot be tho...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013