Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness
نویسندگان
چکیده
منابع مشابه
JIT single machine scheduling problem with periodic preventive maintenance
This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...
متن کاملMinimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints
In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...
متن کاملPeriodic flexible maintenance planning in a single-machine production environment
Preventive maintenance is the essential part of many maintenance plans. From the production point of view, the flexibility of the maintenance intervals enhances the manufacturing efficiency. On the contrary, the maintenance departments tend to know the timing of the long term maintenance plans as certain as possible. In a single-machine production environment, this paper proposes a simulation–o...
متن کاملSingle-machine Scheduling with Periodic and Exible Periodic Maintenance to Minimize Maximum Tardiness
This paper considers a single machine scheduling problem with several mainte-nances periods. Specically, two situations are investigated. In the rst one, maintenance periods are periodically xed: maintenance is required after a periodic time interval. In the second one, the maintenance is not xed but the maximum continuous working time of the machine which is allowed is determined. The objectiv...
متن کاملA Pareto-Optimal Solution for a Multi-Objective Scheduling Problem with Periodic Maintenance Requirement
A Pareto-optimal solution is developed in this paper for a scheduling problem on a single machine with periodic maintenance and non-preemptive jobs. Most of the scheduling problems address only one objective function, while in the real world, such problems are always associated with more than one objective. In this paper, both multi-objective functions and multi-maintenance periods are consider...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & Industrial Engineering
دوره 55 شماره
صفحات -
تاریخ انتشار 2008