A Decentralized and Pull-based Control Loop for On-demand Delivery in Eto Construction Supply..
نویسندگان
چکیده
Engineer-to-Order (ETO) process chain types with a successive installation on-site are common in plant building and the construction industry. Usually, the core processes Engineering, Fabrication and Installation are disconnected, which creates high levels of Work in Progress (WIP) and long lead-times. Furthermore, up to date information about the construction progress, as prerequisite for an on-demand delivery of ETO-components is always difficult to obtain. Usually, to prevent a lack of material on-site, costly intermediate storages are used, which extend the delivery time. Well-known approaches in research, like the Last Planner System (LPS) or the Location Based Management System (LBMS), increase collaboration on-site and improve the reliability of construction schedules, but have a limited impact on synchronizing the supply chain to the construction progress. The approach presented in the paper describes how off-site and on-site production can be coupled, to reach short construction lead-times without wastefully intermediate storages. A first ITprototype, based on “Industry 4.0” principles, was implemented and tested in an Italian medium-sized ETO construction supplier.
منابع مشابه
Energy Delivery at Oil and Gas Wells Construction in Regions With Harsh Climate
Energy delivery at well construction in regions with hard climate is distinguished by variable demand in electric and heat power. Energy consumption of drilling equipment, production and living facilities varies greatly during the year, depending on power load charts and climate conditions. Power supply of remote well construction sites is mostly accomplished by operating autonomous power sourc...
متن کاملA two-level discount model for coordinating a decentralized supply chain considering stochastic price-sensitive demand
In this paper, a discount model is proposed to coordinate pricing and ordering decisions in a two-echelon supply chain (SC). Demand is stochastic and price sensitive while lead times are fixed. Decentralized decision making where downstream decides on selling price and order size is investigated. Then, joint pricing and ordering decisions are extracted where both members act as a single entity ...
متن کاملEffects of integrating physical and financial flows through a closed-loop supply chain network under uncertain demand and return
The impact of financial challenges on the profit of a supply chain, have caused the researcher to model the supply chain network by considering the operational and financial dimensions. Also, the establishment of a closed loop supply chain (CLSC) network has a high effect on economic profit. So, the purpose of this study is to design a stochastic closed loop supply chain network by considering ...
متن کاملA decentralized multi-level leader-follower game for network design of a competitive supply chain
This paper develops a decentralized leader-follower game for network design of a competitive supply chain problem in which a new chain as the leader enters a market with one existing supply chain as a follower. Both chains produce an identical product, customer demand is inelastic and customer utility function is based on Huff gravity-based model. The leader wants to shape his network and set a...
متن کاملCoordinating a decentralized supply chain with a stochastic demand using quantity flexibility contract: a game-theoretic approach
Supply chain includes two or more parties linked by flow of goods, information, and funds. In a decentralized system, supply chain members make decision regardless of their decision's effects on the performance of the other members and the entire supply chain. This is the key issue in supply chain management, that the mechanism should be developed in which different objectives should be align...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2016