A Control System of the Joint-project Accelerator Complex

نویسندگان

  • J. Chiba
  • H. Fujii
  • K. Furukawa
  • N. Kamikubota
  • H. Nakagawa
  • N. Yamamoto
چکیده

The current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented. Phase 1 of the Joint Project has been approved and recently started its construction at the JAERI site at Tokai. The first beam commissioning is scheduled in 2006. In parallel with it, a 60-MeV Linac is now being constructed at the KEK site at Tsukuba for R&D purposes. Recently the Project has officially decided to use the Experimental Physics and Industrial Control System (EPICS). Under the EPICS environment, we are challenged with implementing the Ethernet/IP network for all communication, even at the level of end-point controllers which are currently connected via a field bus. In order to realize such a system, three new controllers (PLCs, WE7000 stations and generalpurpose Ethernet boards) are being developed. A prototype EPICS driver for the PLCs works fine and is used to control the ion-source at the KEK Linac.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

طراحی و ساخت مدولاتور لامپ تترود جهت شتاب‌دهنده پرقدرت الکترون

In this paper, a high power tetrode tube (TH781-200kW, cw) modulator is designed and implemented. This modulator is used for a part of RF system of the first Iranian high power electron accelerator project with similar structure to Rhodotron accelerator. Regarding to the level of sensitive and importance of TH781 tube the modulator system designed with high accuracy. So beside of power suppli...

متن کامل

CONTROL OF FLEXIBLE JOINT ROBOT MANIPULATORS BY COMPENSATING FLEXIBILITY

A flexible-joint robot manipulator is a complex system because it is nonlinear, multivariable, highly coupled along with joint flexibility and uncertainty. To overcome flexibility, several methods have been proposed based on flexible model. This paper presents a novel method for controlling flexible-joint robot manipulators. A novel control law is presented by compensating flexibility to form a...

متن کامل

The Kek/jaeri Joint Project; Status of Design and Development

The Japan Hadron Facility of KEK and the Neutron Science Project of JAERI have been merged to one project; the KEK/JAERI Joint Project for high-intensity proton accelerator facility. The purpose of the Joint Project is to pursue frontier science and nuclear technology. The accelerator for the Joint Project comprises a normaland super-conducting linac, a 3-GeV rapid cycling synchrotron and a 50-...

متن کامل

Towards Measuring the Project Management Process During Large Scale Software System Implementation Phase

Project management is an important factor to accomplish the decision to implement large-scale software systems (LSS) in a successful manner. The effective project management comes into play to plan, coordinate and control such a complex project. Project management factor has been argued as one of the important Critical Success Factor (CSF), which need to be measured and monitored carefully duri...

متن کامل

معرفی پروژه طراحی و ساخت شتاب‌دهنده خطی الکترون پژوهشگاه دانش‌های بنیادی

One of the most commonly used types of accelerators is linear electron accelerator. There is a project is in progress in Institute for research in fundamental sciences (IPM) aiming to design and build such an accelerator. It is defined in such a way that all parts to be built in Iran as possibly as it can. In this paper, after a brief explanation of the components of an electron linear accelera...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002