Assessment of the Current State of Internal Force and the Optimization of Cable Force for an Existing Long-span Pre-Stressed Concrete (PC) Cable-stayed Bridge
نویسندگان
چکیده
Due to the influence of load, fatigue, corrosion, natural material aging and other long-term adverse factors, the state of the internal force of a cable-stayed bridge will be changed. These long-term effects can result in the bridge not meeting specified functional requirements, and potentially resulting in structural failure. This investigation focuses on the parameter identification of a girder for a pre-stressed concrete (PC) cable-stayed bridge. Without considering the influence of cable relaxation and temperature on the girder’s geometric shape, an improved method based on the “cable force-girder’s displacement” relationship is proposed.
منابع مشابه
Internal Force State Recognition of Jiujiang Bridge Based on Cable Force-displacement Relationship
The nearly 21-year-old Jiujiang Bridge, which is suffering from uneven line shape, constant great downwarping of the main beam and cracking of the box girder, needs reinforcement and cable adjustment. It has undergone cable adjustment for twice with incomplete data. Therefore, the initial internal force state of the Jiujiang Bridge is identified as the key for the cable adjustment project. Base...
متن کاملDESIGN OPTIMIZATION OF CABLE-STAYED BRIDGES USING MOMENTUM SEARCH ALGORITHM
Design optimization of cable-stayed bridges is a challenging optimization problem because a large number of variables is usually involved in the optimization process. For these structures the design variables are cross-sectional areas of the cables. In this study, an efficient metaheuristic algorithm namely, momentum search algorithm (MSA) is used to optimize the design of cable-stayed bridges....
متن کاملConstruction of Nagisa Bridge Hybrid System of Cable-stayed Pc Bridge and Steel Suspension Bridge
Nagisa Bridge, a single span footbridge, was recently completed in Aomori prefecture, Japan. The structure of this bridge is a hybrid structure of cable-stayed prestressed concrete bridge and steel suspension bridge. It is the first application as this structure type of bridge in the world. Concrete girders near pylons are supported by stay cables. Steel girders are supported by suspension cabl...
متن کاملA Numeral Research on Effect of Vertical Component of Near Field Earthquakes on Long Span Bridges Built on Different Soil Conditions
In this study we tried to consider effect of vertical component of near zone earthquake (10 to 15 km far from fault) such as Kobe 1995, Northridge 1994, Loma prieta 1989 and Chichi 1999 on a concrete cable bridge by a 320m span in the middle which was built on different type of soils. The SAP software (version14) was selected because I should have done linear and non-linear time history anal...
متن کاملApplication of Structural Damage Control in Seismic Performance Opti- mization of Long-span Cable-stayed Bridge
The damage caused by earthquake is irresistible for human beings, and the structure with poor robustness is most affected by earthquake. Especially when traffic arteries like bridges and highways are affected, the losses will be unimaginable. To reduce the loss in earthquake, the paper targets the long-span cable-stayed bridge and discusses a method of structural damage control. The energy-diss...
متن کامل