An innovative approach for generation of a time location plan in road construction projects

نویسندگان

  • Raj Kapur
  • Nashwan Dawood
چکیده

Existing linear scheduling methods for earthwork activities lack accurate scheduling locations in road construction projects. Project planners and construction managers largely depend on subjective decisions for the allocation of resources at correct locations. This has caused uncertainties in planning and scheduling, and consequently delays and cost overruns of projects. Accurate information of working locations is vital for efficient resource planning, scheduling and equipment mobilisation. In this paper, a theoretical framework for a virtual construction prototype model is developed using the theory of location-based planning and this is used as the basis of sensitivity analysis to identify critical factors affecting road construction. An arithmetic algorithm is developed by incorporating road design data, sectional quantities, variable productivity data, unit cost, site access points, and haulage distance. The model generates a time location plan automatically with the aim to provide location-based scheduling information of earthwork activities. Weekly progress profiles, terrain surfaces, cost profiles and S-curve are the other outputs of the model. Data and information collected from the case studies are used to demonstrate functionalities of the model. Critical factors controlling the productivity of earthwork such as different types of equipment, soil characteristics and site access points were used to display the sensitivity effect by means of “what if scenarios”. The paper concluded that the model is a valuable tool in analysing impacts of different factors associated with productivity data and resource planning from location aspects in the earthwork construction projects.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Model for Prioritizing the Risks Associated with Road Construction Projects Based on Generalized Secondary Goal

   This paper aims at providing a new model based on Data Envelopment Analysis (DEA) to prioritize project risks. It is clear that the large amounts of involved capitals, the long term of infrastructure projects’ implementation, and the project management problems in on-time completion of projects indicate the necessity of paying particular attention to this issue and conducting applied researc...

متن کامل

OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING

During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...

متن کامل

A new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost

Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...

متن کامل

Rough sets theory in site selection decision making for water reservoirs

Rough Sets theory is a mathematical approach for analysis of a vague description of objects presented by a well-known mathematician, Pawlak (1982, 1991). This paper explores the use of Rough Sets theory in site location investigation of buried concrete water reservoirs. Making an appropriate decision in site location can always avoid unnecessary expensive costs which is very important in constr...

متن کامل

ارائه یک زمانبندی بهینه تخصیص منابع مالی در یک پروژه طراحی و ساخت نیروگاه آبی بر اساس پارامترهای تصادفی فازی با استفاده از الگوریتم هیبریدی

Currently considering increasing investment in large projects by the private sector and implementation of projects with many techniques such as design, construction and financing plan with financing is very important. This paper is considering uncertainty in time and cost of various activities a project planning, financial resources for loans should be a way to finance a project cost is lowes...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011