Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling
نویسندگان
چکیده
Lot-streaming is the process of splitting a job (lot) into a number of smaller sublots so that successive operations can be overlapped in a multi-stage production system. This paper presents a procedure for minimizing the mean weighted absolute deviation from due dates when jobs are scheduled in a lot-streaming #ow shop. This performance criterion has been shown to be non-regular and requires a search among schedules with inserted idle times to "nd an optimal solution. For a given job sequence, we present linear programming formulations to obtain optimal sublot completion times for cases where bu!ers between successive machines have limited or in"nite capacities, and sublots have equal-size or are consistent. A no-wait #ow shop problem is also considered. Sixteen pairwise interchange methods are considered to generate the best sequences. These algorithms are obtained by combining four rules to generate initial sequences with four neighborhood search mechanisms. Computational experiments are conducted on 140 test problems. The results show that the best solutions are obtained by the heuristic algorithm with a non-adjacent pairwise interchange method and the smallest overall slack time rule to generate the initial sequence.
منابع مشابه
A Genetic Algorithm for Lot-Streaming
A hybrid genetic algorithm (HGA) approach is proposed for a lot-streaming flow shop scheduling problem, in which a job (lot) is split into a number of smaller sublots so that successive operations can be overlapped. The objective is the minimization of the mean weighted absolute deviation of job completion t imes from due dates.
متن کاملCustomer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop
This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...
متن کاملHybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage
In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...
متن کاملElectromagnetism-like algorithm for fuzzy flow shop batch processing machines scheduling to minimize total weighted earliness and tardiness
In this paper, we study a flow shop batch processing machines scheduling problem. The fuzzy due dates are considered to make the problem more close to the reality. The objective function is taken as the weighted sum of fuzzy earliness and fuzzy tardiness. In order to tackle the given problem, we propose a hybrid electromagnetism-like (EM) algorithm, in which the EM is hybridized with a diversi...
متن کاملA comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times
In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Computers & OR
دوره 29 شماره
صفحات -
تاریخ انتشار 2002