Influence of Project Duration constraint on efforts in Constructive Cost Model and optimizing the efforts to obtain accuracy
نویسندگان
چکیده
Software cost estimation accuracy is one of the biggest challenges in the field of software development for developer and customers. In general, many algorithmic models like Constructive Cost Model (COCOMO) are used to estimate cost but they have inability to deal with uncertainties related to software development environment and other factors influencing the software development process. The Evolutionary computation approaches provide the solution for estimating the effort along with handling these uncertainties. In this paper, COCOMO is used as algorithmic model and an attempt is being made to validate the soundness of genetic algorithm using NASA project data. The main objective of this work is to analyze the influence of project duration constraints on efforts and to improve accuracy of system’s output when evolutionary computation based approach is applied to the NASA dataset to derive the software effort estimates. Proposed approach is validated by using 63 NASA project dataset. Empirical results show that application of the proposed approach for software effort estimates resulted in smaller mean magnitude of relative error (MMRE) for all cases and probability of a project(PRED) having a relative error of less than or equal to 0.35 as compared with results obtained with COCOMO is improved significantly for most of the cases.
منابع مشابه
A Hybrid Intelligent Model to Increase the Accuracy of COCOMO
Nowadays, effort estimation in software projects is turned to one of the key concerns for project managers. In fact, accurately estimating of essential effort to produce and improve a software product is effective in software projects success or fail, which is considered as a vital factor. Lack of access to satisfying accuracy and little flexibility in existing estimation models have attracted ...
متن کاملA New Optimized Hybrid Model Based On COCOMO to Increase the Accuracy of Software Cost Estimation
The literature review shows software development projects often neither meet time deadlines, nor run within the allocated budgets. One common reason can be the inaccurate cost estimation process, although several approaches have been proposed in this field. Recent research studies suggest that in order to increase the accuracy of this process, estimation models have to be revised. The Construct...
متن کاملA New Cost Model for Estimation of Open Pit Copper Mine Capital Expenditure
One of the most important issues in all stages of mining study is capital cost estimation. Determination of capital expenditure is a challenging issue for mine designers. In recent decade, quite a few number of studies have focused on proposing estimation models to predict mining capital cost. However, these efforts have not achieved to a predictor model with reliable range of error. Both of ov...
متن کاملA New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value
Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...
متن کاملA New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value
Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...
متن کامل