Sequence-dependent scheduling with order deliveries

نویسندگان

  • Bertrand M. T. Lin
  • Peng-Yeng Yin
  • Y. S. Liu
چکیده

This paper studies a sequence-dependent scheduling problem incorporating order delivery, motivated by satellite imaging scheduling. A set of jobs is to be processed on a single machine and each job belongs to a specific group. The completion time of a group is the moment when all jobs belonging to this group are completed. The problem is to determine a processing sequence of the jobs such that the sum of weighted completion times over all groups is minimized. We present a binary integer program to formulate the studied problem and then develop an O(n2) dynamic programming algorithm for determining optimal solutions. To produce approximate solutions within an acceptable time, we design a tabu search algorithm, an iterated local search algorithm and a genetic algorithm. Computational experiments are conducted to study the performance of the integer program and the solution algorithms. Numerical statistics suggest that the binary integer program can reach optimal solutions faster than the integer program existing in the literature, and the iterated local search algorithm outperforms other approaches when the number of jobs increases. 2013 Elsevier Inc. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem

Flow-shop scheduling problem (FSP) deals with the scheduling of a set of n jobs that visit a set of m machines in the same order. As the FSP is NP-hard, there is no efficient algorithm to reach the optimal solution of the problem. To minimize the holding, delay and setup costs of large permutation flow-shop scheduling problems with sequence-dependent setup times on each machine, this pap...

متن کامل

Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times

Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...

متن کامل

An Improved Optimization Model for Scheduling of a Multi-Product Tree-Like Pipeline

In the petroleum supply chain, oil refined products are often delivered to distribution centers by pipelines since they provide the most reliable and economical mode of transportation over large distances. This paper addresses the optimal scheduling of a complex pipeline network with multiple branching lines. The main challenge is to find the optimal sequence and time of product injections/deli...

متن کامل

Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times

Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...

متن کامل

A three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times

This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup < /div> times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditiona...

متن کامل

Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times

We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Applied Mathematics and Computation

دوره 222  شماره 

صفحات  -

تاریخ انتشار 2013