A Model for Automated Generation of Resource-driven Construction Schedule for Housing Industry

نویسندگان

  • A. Cindrela Devi
  • K. Ananthanarayanan
چکیده

The efficacy of managing a construction project mainly depends on proper planning and scheduling. Mass housing projects are highly repetitive in nature, as the methods used for construction are often repetitive or cyclic. Resources are therefore being deployed repeatedly for the similar or identical tasks in these projects. In order to eradicate delays in mobilizing resources, an efficient resource schedule is required. Traditional scheduling tools like Critical Path Method (CPM), Programme Evaluation and Review Technique (PERT) are less effective in scheduling repetitive construction projects, as they consider availability of resources are unlimited. The main challenge in preparing construction schedule for repetitive projects is synchronizing the precedence logic and the allocation of resources as per requirements for all the activities. Consequently, activity scheduling and resource planning are prepared in parallel and this will facilitate in eliminating delays and idle resources across the projects thereby, controls the chain-reaction management (ripple effects). Nevertheless, almost all the repetitive scheduling methods developed so far have been giving focus on continuous repetitive projects, whereas in the present study, the emphasis is on discrete (non-linear) repetitive projects. This paper presents a model that uses genetic algorithms to optimally assign resources to repetitive activities, which aimed to minimize the total project cost & duration, idle cost & time and to maximize resource utilization. In the present study, an attempt is made to generate a resource-driven construction schedule automatically, with which resources can optimally be allocated to the activities. This schedule can be very useful in improving productivity and saving construction time and cost and also in decision-making. In addition, a case study is delineated to check the efficiency and effectiveness of the resource-driven construction schedule which is automated.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modeling and Solution Procedure for a Preemptive Multi-Objective Multi-Mode Project Scheduling Model in Resource Investment Problems

In this paper, a preemptive multi-objective multi-mode project scheduling model for resource investment problem is proposed. The first objective function is to minimize the completion time of project (makespan);the second objective function is to minimize the cost of using renewable resources. Non-renewable resources are also considered as parameters in this model. The preemption of activities ...

متن کامل

Change Management and Change Process Model for the Iranian Construction Industry

Changes are inevitable in construction projects. They could lead to disruptive impacts on the quality, schedule and budget of projects. Identifying changes and anticipating their consequences can help project teams mitigate these negative impacts. As a result, a change process model has been defined to improve this procedure. At first the present paper the defines some of the key terms in this ...

متن کامل

Time Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry

This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...

متن کامل

AN EFFECTIVE METHOD FOR SIMULTANEOUSLY CONSIDERING TIME-COST TRADE-OFF AND CONSTRAINT RESOURCE SCHEDULING USING NONLINEAR INTEGER FRAMEWORK

Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...

متن کامل

Innovation Strategies, Performance Diversity and Development: An Empirical Analysis in Iran Construction and Housing Industry

Innovation strategy is the basis of success in innovation and performance improvement. This paper represents a model related to the most important innovation strategies which have a significant impact on performance of industries. Then, it examines the relationships between innovation strategies and diversity and development of the performance. So, the empirical research was carried out in Iran...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007