A Project Risk Management Methodology Developed for an Electrical Portuguese Organization
نویسندگان
چکیده
1 A Project Risk Management Methodology Developed for an Electrical Portuguese Organization Joana Peixoto, Department of Production and Systems Engineering / ALGORITMI Research Centre, Guimarães, Portugal Anabela Tereso, Department of Production and Systems Engineering / ALGORITMI Research Centre, Guimarães, Portugal Gabriela Fernandes, Department of Production and Systems Engineering / ALGORITMI Research Centre, Guimarães, Portugal Rui Almeida, EDP Distribution, Porto, Portugal
منابع مشابه
Methodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction
The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...
متن کاملA Systems Dynamics Model for Project Management systems of Project-Based Organization
It is obvious that the success of a project-based organization is dependent on its projects. A variety of tools such as the project excellence model, project management maturity models, the earned value method, have been developed in this regard, but there are still delays in projects because the projects have dynamic nature with non-linear relationships and feedback processes during the projec...
متن کاملA Multi-Criteria Decision-Making Approach with Interval Numbers for Evaluating Project Risk Responses
The risk response development is one of the main phases in the project risk management that has major impacts on a large-scale project’s success. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. Conventional approaches tend to be less effective in dealing with the imprecise of the risk response deve...
متن کاملA Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects
Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...
متن کاملDetermining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- IJHCITP
دوره 7 شماره
صفحات -
تاریخ انتشار 2016