A Risk Assessment Model for Evolutionary Software Projects
نویسندگان
چکیده
Current early risk assessment techniques rely on subjective human judgments and unrealistic assumptions such as fixed requirements and work breakdown structures. This is a weak approach because different people could arrive at different conclusions from the same scenario even for projects with a stable and well-defined scope, and such projects are rare. This paper introduces a formal model to assess the risk and the duration of software projects automatically, based on objective indicators that can be measured early in the process. The model has been designed to account for significant characteristics of evolutionary software processes, such as requirement complexity, requirement volatility and organizational efficiency. The formal model based on these three indicators estimates the duration and risk of evolutionary software processes. The approach supports (a) automation of risk assessment and, (b) early estimation methods for evolutionary software processes.
منابع مشابه
Developing a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System
Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...
متن کاملDetermining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
متن کاملPower plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method
Economic growth in developing countries has resulted in increasing demand for infrastructure projects like power plants. To meet these development needs, the government of Iran has engaged companies to carry out power plant projects. While many papers have been written on the subject of project risk management, little information exists on the actual use of risk management in practice. The prim...
متن کاملStatic risk management and assessment models operates without any feedback capability and lacks the dynamics of decision adjustments based on a futuristic risk assessment of risk events. Static risk management and assessment models
A dynamic software risk assessment model is presented. Analogies between dynamic financial analysis and software risk assessment models are established and based on these analogies it suggested that dynamic risk model for software projects is the way to move forward for the risk assessment of software project. It is shown how software risk assessment change during different phases of a software...
متن کاملDesign and Implementation of Project Time Management Risk Assessment Tool for SME Projects using Oracle Application Express
Risk Assessment Tool (RAT) is an expert system that assesses, monitors, and gives preliminary treatments automatically based on the project plan. In this paper, a review was taken out for the current project time management risk assessment tools for SME software development projects, analyze risk assessment parameters, conditions, scenarios, and finally propose risk assessment tool (RAT) model ...