Irreversible Investment, Operating Flexibility, and Time Lags

نویسندگان

  • Ryuta Takashima
  • Makoto Goto
  • Motoh Tsujimura
چکیده

We consider an optimal investment problem when a firm such as an electric power company has the operational flexibility to expand and contract capacity with fixed cost. This problem is formulated as an impulse control problem combined with optimal stopping. Consequently, we obtain optimal investment timing, optimal capacity expansion and contraction timing, and the investment value. We also show investment, capacity expansion and contraction rule are influenced by the price volatility and the initial capacity is also influenced by the ratio between base-load plant and peak-load plant. In addition, we investigate how time lag between investment and operation influences the investment rule.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Resolving the Commitment versus Flexibility Trade-off: the Role of Resource Accumulation Lags

We examine how time-consuming resource accumulation influences the classic strategy trade-off between commitment and flexibility. In particular, using 1975–95 data from the worldwide petrochemical industry, we study the impact of new plants’ time-to-build on firms’ decisions to invest under uncertainty. Our results suggest a nontrivial positive effect of resource accumulation lags on investment...

متن کامل

Investment and Uncertainty With Time to Build: Evidence from Entry into U.S. Copper Mining

The standard real–options model predicts that increased uncertainty discourages investment. When projects are large and take time to build, however, that prediction can be reversed. We investigate the investment/uncertainty relationship empirically using historical data on opening dates of new U.S. copper mines — large, irreversible projects with substantial construction lags. Both the timing o...

متن کامل

Valuing flexibility in demand-side response: A real options approach

The investment interests in the electricity industry are transmitted through various mechanisms to other economic activities. This paper considers methods for esteeming the adaptability of demand-side response (DSR) in its capacity to react to future uncertainties. The capacity to evaluate this adaptability is particularly critical for vitality frameworks speculations given their extensive and ...

متن کامل

Production Flexibility and Investment under Uncertainty

This paper extends the theory of real options, which mainly considers the problem of timing of investment, by letting the firm choose also the quantity produced after the time of investment. Under the conditions of irreversible investment and uncertainty in future demand, the firm can adjust its output quantity at each point in time in the future. Our paper shows that changing the structure of ...

متن کامل

The Effects of Misspecification of Stochastic Processes on Investment Appraisal

For decades financial economists have been attempted to determine the optimal investment policy by recognizing the option value embedded in irreversible investment whose project value evolves as a geometric Brownian motion (GBM). This paper aims to examine the effects of the optimal investment trigger and of the misspecification of stochastic processes on investment in real options applications...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • APJOR

دوره 27  شماره 

صفحات  -

تاریخ انتشار 2010