Thesis Project Progress Report

نویسندگان

  • Alex Song
  • Mark F Schulz
چکیده

The purpose of this progress report is to describe the aims of the thesis project and to outline the project plan. The report will discuss the originality of the project through a review of current research. The literature review will present current technologies in the research area and the relevance to the thesis project will be assessed. Current commercial products will also be discussed. Finally the aims and objectives of the project and a project plan will be presented. The project plan will form the most significant part of the report as it will cover the resources required and the techniques to be used for the project as well as a time scale for project milestones and the expected outcomes of the project.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

2011 Senior Thesis Project Reports Place Recognition for Indoor Blind Navigation Contents

This technical report collects the final reports of the undergraduate Computer Science majors from the Qatar Campus of Carnegie Mellon University who elected to complete a senior research thesis in the academic year 2010–11 as part of their degree. These projects have spanned the students’ entire senior year, during which they have worked closely with their faculty advisors to plan and carry ou...

متن کامل

Mobility Support for Visually Impaired Web Travellers End of Second Year Interview Report

This short report presents the progress of the PhD project which aims to improve the mobility of visually impaired Web users. The thesis of this PhD project is that “Web pages could be analysed for identifying travel objects and their roles, in consequence they could be annotated with semantic metadata so that a tool could be devised to transform Web pages in a way that the objects could play t...

متن کامل

Project resource investment problem under progress payment model

As a general branch of project scheduling problems, resource investment problem (RIP) considers resource availabilities as decision variables to determine a level of employed resources minimizing the costs of the project. In addition to costs (cash outflows), researchers in the later extensions of the RIP took payments (cash inflows) received from clients into account and used the net present v...

متن کامل

Analysis of critical paths in a project network with random fuzzy activity times

Project planning is part of project management, which is relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Initially, the project scope is defined and the appropriate methods for completing the project are determined. In this paper a new approach for the critical path analyzing a project network with random fuzzy activi...

متن کامل

2010 Senior Thesis Project Reports Advisor: Kemal Oflazer and Noah Smith Rich Entity Type Recognition in Text Senior Thesis Table of Contents

This technical report collects the final reports of the undergraduate Computer Science majors from the Qatar Campus of Carnegie Mellon University who elected to complete a senior research thesis in the academic year 2009–10 as part of their degree. These projects have spanned the students’ entire senior year, during which they have worked closely with their faculty advisors to plan and carry ou...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2001