From the Aggregate Plan to Lot-Sizing in Multi-level Production Planning

نویسنده

  • Jean-Claude Hennet
چکیده

The hierarchical approach to production planning is classically used to handle the organization and logistics in complex production systems. It distinguishes several decision levels using different descriptions of the production process. The upper-level planning horizon is relatively long, and, since the number of time intervals (or buckets) of this horizon is restricted by computational limitations, these buckets are long compared with production cycle times. At this time scale, discrete flows in manufacturing plants can be approximated by continuous flows describing production processes in an aggregated and simplified way. Product flows are generally associated with families of products (Bitran, Tirupati 1993 [?]). In the discrete-time framework used in this study, these flows generate, over each time bucket, important amounts of products, which can be approximately represented by continuous variables. The optimal planned outputs are computed on the basis of forecasted demands and aggregate resource constraints. The results obtained at the aggregate planning level then have to be disaggregated in time and detailed by products and items, taking into account some basic constraints originating from operational levels. As the time horizon is chosen smaller, hard constraints and conflicts increase and continuous variables are less appropriate for describing real phenomena (Agnetis et al. [?]). Other models, of the discrete event type, are needed to schedule production, supplies and sales. Heterogeneous models are obviously hard to combine, and much research effort have been devoted to constructing integrated planning and scheduling schemes (see e.g. Gershwin 1987 [?], Dauzère-Péres, Lasserre 1994 [?]).

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multi-level Capacitated Lot-sizing Problem with Safety Stock Deficit and Production Manners: A Revised Simulated Annealing

[1] Corresponding author e-mail: [email protected]   [1] Corresponding author e-mail: [email protected]   Lot-sizing problems (LSPs) belong to the class of production planning problems in which the availability quantities of the production plan are always considered as a decision variable. This paper aims at developing a new mathematical model for the multi-level ca...

متن کامل

A hybrid ant colony optimization algorithm to optimize capacitated lot-sizing problem

The economical determination of lot size with capacity constraints is a frequently complex, problem in the real world. In this paper, a multi-level problem of lotsizing with capacity constraints in a finite planning horizon is investigated. A combination of ant colony algorithm and a heuristic method called shifting technique is proposed for solving the problem. The parameters, including the co...

متن کامل

OPTIMAL LOT-SIZING DECISIONS WITH INTEGRATED PURCHASING, MANUFACTURING AND ASSEMBLING FOR REMANUFACTURING SYSTEMS

This work applies fuzzy sets to the integration of purchasing, manufacturing and assembling of production planning decisions with multiple suppliers, multiple components and multiple machines in remanufacturing systems. The developed fuzzy multi-objective linear programming model (FMOLP) simultaneously minimizes total costs, total $text{CO}_2$ emissions and total lead time with reference to cus...

متن کامل

Capacitated lot sizing models: a literature review

In the present paper, we discuss one of the many processes arising in the context of supply chain management, namely production planning. We focus on one type of production planning models called capacitated lot sizing models. These models appear to be well suited for the usually rather in exible production resources found in the process industries. We review the literature on single-level sing...

متن کامل

A New Bi-objective Mathematical Model to Optimize Reliability and Cost of Aggregate Production Planning System in a Paper and Wood Company

In this research, a bi-objective model is developed to deal with a supply chain including multiple suppliers, multiple manufacturers, and multiple customers, addressing a multi-site, multi-period, multi-product aggregate production planning (APP) problem. This bi-objective model aims to minimize the total cost of supply chain including inventory costs, manufacturing costs, work force costs, hir...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006