Optimum Design of Penstock for Hydro Projects
نویسنده
چکیده
Penstock, a closed conduit, is an important component of hydropower projects. Various optimum design of penstock. These methods are either based on friction loss in the penstock. These formulae formulae available for penstock design have been compared the optimum design of penstock based on minimizing developed method, diameter and annual cost of penstocks out and reduction in annual cost of penstock
منابع مشابه
Design of Micro - Hydro - Electric Power Station
Micro-hydro-electric power is both an efficient and reliable formof clean source of renewable energy. It can be an excellent method of harnessing renewable energy from small rivers and streams. The micro-hydro project designed to be a run -of-river type, because it requires very little or no reservoir in order to power the turbine. The water will run straight through the turbine and back into t...
متن کاملSliding Mode/H∞ Control of a Hydro-power Plant
This paper presents a new approach to Load Frequency Control (LFC) for a hydro-power plant. The control algorithm combines sliding mode control with H∞ technique. The dynamic model of an entire hydro-power plant has been developed. The sliding hyperplane is constructed by H∞ full state feedback control method. The ideal lossless turbine-penstock model is used in this paper to conduct the simula...
متن کاملModeling Hydro Power Plants and Tuning Hydro Governors as an Educational Guideline
Appropriate modeling of components and related controllers are very significant in studying dynamic performance of power systems. In this paper, an educational procedure for modeling, simulation, and governor tuning of hydro power plants is presented. Different existing dynamic models of hydro plant components are reviewed. The procedure for calculating the required parameters from real plant d...
متن کاملA game theory approach for determining optimum strategy of claim resolution in construction projects
Claim is a big challenge for the contractors and the owners in construction projects. Claims are considered to be one of the most disruptive events of a project. A suitable claim resolution strategy can prevent the damages to the project and the involved parties. In this research, a mathematical model using game theory is presented to find the optimum strategy for resolving cost-related claims ...
متن کاملDesign and Implementation of Real Time Monitoring System of Water Flow in Hydro Power Plants Using Virtual Instrumentation Software
In this paper it is presented the real time monitoring system of water flow in hydro power plants which is designed with virtual instrumentation software. Water flow through penstock has been measured by using flow sensor. Volumetric flow of excess water, in the case of emergency evacuation of water, has been calculated from position of control gates and water level. Relationship between the vo...
متن کامل