Bringing social standards into project evaluation under dynamic uncertainty.

نویسندگان

  • Odin K Knudsen
  • Pasquale L Scandizzo
چکیده

Society often sets social standards that define thresholds of damage to society or the environment above which compensation must be paid to the state or other parties. In this article, we analyze the interdependence between the use of social standards and investment evaluation under dynamic uncertainty where a negative externality above a threshold established by society requires an assessment and payment of damages. Under uncertainty, the party considering implementing a project or new technology must not only assess when the project is economically efficient to implement but when to abandon a project that could potentially exceed the social standard. Using real-option theory and simple models, we demonstrate how such a social standard can be integrated into cost-benefit analysis through the use of a development option and a liability option coupled with a damage function. Uncertainty, in fact, implies that both parties interpret the social standard as a target for safety rather than an inflexible barrier that cannot be overcome. The larger is the uncertainty, in fact, the greater will be the tolerance for damages in excess of the social standard from both parties.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Assessment Method for Project Cash Flow under Interval-Valued Fuzzy Environment

Effective project management requires reliable knowledge of cash required in different stages of project life cycle. Getting this knowledge is highly dependent on sophisticated consideration of project environment. Nature of projects and their environments are associated with uncertain conditions. In this paper, a new project cash flow assessment method based on project scheduling is proposed t...

متن کامل

A New Uncertain Modeling of Production Project Time and Cost Based on Atanassov Fuzzy Sets

  Uncertainty plays a major role in any project evaluation and management process. One of the trickiest parts of any production project work is its cost and time forecasting. Since in the initial phases of production projects uncertainty is at its highest level, a reliable method of project scheduling and cash flow generation is vital to help the managers reach successful implementation of the ...

متن کامل

A new framework for high-technology project evaluation and project portfolio selection based on Pythagorean fuzzy WASPAS, MOORA and mathematical modeling

High-technology projects are known as tools that help achieving productive forces through scientific and technological knowledge. These knowledge-based projects are associated with high levels of risks and returns. The process of high-technology project and project portfolio selection has technical complexities and uncertainties. This paper presents a novel two-parted method of high-technology ...

متن کامل

Optimization Model of Hirmand River Basin Water Resources in the Agricultural Sector Using Stochastic Dynamic Programming under Uncertainty Conditions

In this study, water management allocated to the agricultural sector’ was analyzed using stochastic dynamic programming under uncertainty conditions. The technical coefficients used in the study referred to the agricultural years, 2013-2014. They were obtained through the use of simple random sampling of 250 farmers in the region for crops wheat, barley, melon, watermelon and ruby grapes under ...

متن کامل

Assessing the Effective Factors on JudgingArchitectural Design Projects of UniversityStudents

Since nature of architecture is quite different from that of other fields of study, the criteria used forjudging projects in this field continuously undergo some changes. On the other hand, because of the undeniable role ofhuman factors in judging the projects, there is always a percentage of deviation from the standard given the interestsof the judging committee. The standards of judging archi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Risk analysis : an official publication of the Society for Risk Analysis

دوره 25 2  شماره 

صفحات  -

تاریخ انتشار 2005