Enhanced Grinder Framework with Scheduling and Improved Agents
نویسندگان
چکیده
Researchers are still trying to find effective ways to test web application. There are many techniques and tools for web application testing. In this dissertation, we have enhanced grinder performance tool with scheduling and improved Agents. The Grinder makes use of a powerful distributed Java load testing framework that allows simulation of multiple user loads across different “agents” which can be managed by a centralized controller or “console”. A grinder agent/worker processes exits once Grinder Console process ends session. We have added scheduler which works as a service on Grinder agent systems. This add-on will help users to start grinder from console itself. Grinder does not provide the way for distributing the agents so they must be deployed and started manually in all machines. There is no way that these agents keep running at back end. In enhanced grinder load increases in steps as done in J meter. Previous Grinder does not allow addition of heterogeneous agents to a grinder test, we will be removing this limitation by making Grinder agents use specified configuration in agents’ properties while seeming to grinder Console. Enhanced grinder allows heterogeneous workers capability.
منابع مشابه
AN EFFECTIVE METHOD FOR SIMULTANEOUSLY CONSIDERING TIME-COST TRADE-OFF AND CONSTRAINT RESOURCE SCHEDULING USING NONLINEAR INTEGER FRAMEWORK
Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...
متن کاملA Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)
Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...
متن کاملTrain Scheduling Problem - Phase I: A General Simulation Modeling Framework
One of the important problems in management of railway systems is train scheduling problem. This is the problem of determining a timetable for a set of trains that do not violate infrastructure capacities and satisfies some operational constraints. In this study, a feasible timetable generator framework for stochastic simulation modeling is developed. The objective is to obtain a feasible tr...
متن کاملFlexible Scheduling of Active Distribution Networks for Market Participation with Considering DGs Availability
The availability of sufficient and economic online capacity to support the network while encountering disturbances and failures leading to supply and demand imbalance has a crucial role in today distribution networks with high share of Distributed Energy Resources (DERs), especially Renewable Energy Resources (RESs). This paper proposes a two-stage decision making framework for the Distribution...
متن کاملAn Effective Task Scheduling Framework for Cloud Computing using NSGA-II
Cloud computing is a model for convenient on-demand user’s access to changeable and configurable computing resources such as networks, servers, storage, applications, and services with minimal management of resources and service provider interaction. Task scheduling is regarded as a fundamental issue in cloud computing which aims at distributing the load on the different resources of a distribu...
متن کامل