Triumf Cyclotron Vacuum System Upgrade and Operational Experience
نویسندگان
چکیده
The replacement of the 30-year-old Philips cryogenerator with a modern LINDE-1630 helium refrigerator is an important component of TRIUMF’s ongoing 500 MeV cyclotron refurbishing program. Two 10.7 m long cryopanels are cooled with liquid helium rather than with 17 K helium gas, as was the case with the cryogenerator. This has increased the pumping speed and, respectively, improved the vacuum in the approximately 100 m cyclotron tank. Additionally, the thermal shield, previously cooled with helium gas, is now cooled with liquid nitrogen. These changes have resulted in increased reliability of the cyclotron vacuum system and, consequently, longer operation periods without maintenance. The new refrigeration unit was commissioned in September 2007. The results from over one year of operational experience are discussed. Also, data on hydrogen cryopumping is presented. INTRODUCTION The prior cryogenerator [1] used for TRIUMF’s cyclotron was replaced with a modern helium refrigerator. The helium refrigerator liquefies helium for use in cooling the cryopanels, essential for maintaining adequate vacuum in the cyclotron. Figure 1 depicts the cryogenic systems and transfer lines in their current state. Installation of this new helium refrigerator has resulted in improvements in cyclotron vacuum, since the cryopanels can now be cooled with liquid helium, compared to the prior system which used cold helium gas. This has also improved the cyclotron reliability and increased the time between cryopanel defrosts. The new system has undergone several tests to quantify the resulting improvements as well as to confirm continued performance. Tests have included measurements of the pumping speed of the cyclotron cryopanels and measurements of the helium refrigerator’s cooling power and liquefaction rate. The results from these tests are presented below. Figure 1: Cyclotron Cryogenic System Diagram. Paper presented at PAC 09, 23rd Particle Accelerator Conference, Vancouver May 4-8 TR-PP-09-0
منابع مشابه
Construction and Operation of Cyclotrons for Medical Isotopes
Modern high intensity commercial cyclotron systems are continuously being improved to achieve higher beam power, reliability and ease of operation. Other factors playing a part in the ongoing development of commercial cyclotrons include the need for lower radiation dose to personnel, flexibility of operation (multiple beams, variable energy), and the desire to minimize the routine maintenance r...
متن کاملCommissioning activities and first results from the collective Thomson scattering diagnostic on ASDEX Upgrade (invited).
The collective Thomson scattering (CTS) diagnostic installed on ASDEX Upgrade uses millimeter waves generated by the newly installed 1 MW dual frequency gyrotron as probing radiation at 105 GHz. It measures backscattered radiation with a heterodyne receiver having 50 channels (between 100 and 110 GHz) to resolve the one-dimensional velocity distribution of the confined fast ions. The steerable ...
متن کاملVacuum system upgrade for extended Q-range small-angle neutron scattering diffractometer (EQ-SANS) at SNS
The Extended Q-range Small-angle Neutron Scattering Diffractometer (EQ-SANS) instrument at the spallation neutron source (SNS), Oak Ridge, Tennessee, incorporates a 69 m3 detector vessel with a vacuum system which required an upgrade with respect to performance, ease of operation, and maintenance. The upgrade focused on improving pumping performance as well as optimizing system design to minimi...
متن کاملOptimal Timing for Spark Recovery in the Triumf Cyclotron
In the TRIUMF cyclotron when a spark occurs it is necessary to shut off the RF drive and to initiate an RF restart procedure. It is also desirable to restore the full operational dee voltage as soon as possible in order to prevent thermal detuning of the resonant cavity. However, when the RF drive is shut off, the disappearance of Lorentz force on the resonator hot-arms causes the hot-arms to v...
متن کاملDual array 3D electron cyclotron emission imaging at ASDEX Upgrade.
In a major upgrade, the (2D) electron cyclotron emission imaging diagnostic (ECEI) at ASDEX Upgrade has been equipped with a second detector array, observing a different toroidal position in the plasma, to enable quasi-3D measurements of the electron temperature. The new system will measure a total of 288 channels, in two 2D arrays, toroidally separated by 40 cm. The two detector arrays observe...
متن کامل