−− This paper presents a new Fuzzy Dynamic Programming model that calculates the optimum solution of problems with uncertainties in data defined by fuzzy sets. The result includes the determination of an Intrinsic Risk Threshold of the solution. Extrinsic Risk Thresholds may also be set by a Decision Maker, in order to obtain more robust solutions. The technique is applied to the calculation of Distribution System expansion costs to serve the objectives of a Regulatory Authority (Regulator) in fixing levels of efficiency, targets and penalties to a regulated market. Keywords−− Distribution Planning; Fuzzy Dynamic Programming; Risk Analysis, Risk Threshold, Fuzzy Regret.
منابع مشابه
Multi-objective Dynamic Planning of Substations and Primary Feeders Considering Uncertainties and Reliability
This research uses a comprehensive method to solve a combinatorial problem of distribution network expansion planning (DNEP) problem. The proposed multi-objective scheme aims to improve power system's accountability and system performance parameters, simultaneously, in the lowest possible costs. The dynamic programming approach is implemented in order to find the optimal sizing, siting and timi...
متن کاملDynamic Planning the Expansion of Electric Energy Distribution Systems Considering Distributed Generation Resources in the Presence of Power Demand Uncertainty
In this paper, a new strategy based on a dynamic (time-based) model is proposed for expansion planning of electrical energy distribution systems, taking into account distributed generation resources and advantage of the techno-economic approach. In addition to optimal placement and capacity, the proposed model is able to determine the timing of installation / reinforcement of expansion options....
متن کاملTransmission Planning in Deregulated Environments
A new market based approach for transmission expansion planning in deregulated environments is presented in this paper. In this approach, transmission-planning decisions are made based on the electric power market conditions. The main contribution of this research is 1) Introducing a new probabilistic tool for analyzing the electric market conditions, 2) Defining new criteria for ranking transm...
متن کاملA New Uncertain Modeling of Production Project Time and Cost Based on Atanassov Fuzzy Sets
Uncertainty plays a major role in any project evaluation and management process. One of the trickiest parts of any production project work is its cost and time forecasting. Since in the initial phases of production projects uncertainty is at its highest level, a reliable method of project scheduling and cash flow generation is vital to help the managers reach successful implementation of the ...
متن کاملA Fuzzy Multi Objective Programming Model for Power Generation and Transmission Expansion Planning Problem
The increasing consumption of electricity over time forces different countries to establishnew power plants and transmission lines. There are various crisp single-objective mathematicalmodels in the literature for the long-term power generation and transmission expansion planning tohelp the decision makers to make more reasonable decisions. But, in practice, most of the parametersassociated wit...